Subcontractor / Foreman Procurement Management Strategy for Building Projects on Quality and Time Performance (Case Study: PT WIKA Gedung, Tbk)
Journal of Architecture and Civil Engineering · 2024
DOI: 10.35629/8193-09090110 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Architecture and Civil Engineering, 2024. Verfasst von Nur Cahaya Devie und 2 weiteren Autor:innen.
Abstract (Originalsprache)
The development of the construction sector in Indonesia continues to experience very rapid growth over time. One aspect of success in development is through developing competent workforce performance. Accuracy in the selection of subcontractors/foremen carried out by the person in charge of the project must be given great attention, so that there are no disputes between the two parties which could hamper the implementation of the construction project. This research aims to determine the extent of implementation of the analysis of factors that influence subcontractor/foreman management strategies in PT construction projects. WIKA Gedung, Tbk can be applied. In this research, interviews, observations and questionnaires were conducted which were distributed to 79 employees of PT WIKA Gedung, Tbk consisting of Project Managers and Heads of the Commercial / Equipment Procurement Section to obtain test data.The data obtained is through variable and that measured it, variable X (Subcontractor/Foreman Procurement Management Strategy) and Variable Y1 (Schedule Performance) as well as Variable Y2 (Quality Performance) with several methods using, Correlation Analysis, Regression Analysis and Quality Test.
Zitieren
APA
Devie, N. C., Nurjaman, H. N., & Suryani, F. (2024). Subcontractor / Foreman Procurement Management Strategy for Building Projects on Quality and Time Performance (Case Study: PT WIKA Gedung, Tbk). Journal of Architecture and Civil Engineering. https://doi.org/10.35629/8193-09090110
Vancouver
Devie NC, Nurjaman HN, Suryani F. Subcontractor / Foreman Procurement Management Strategy for Building Projects on Quality and Time Performance (Case Study: PT WIKA Gedung, Tbk). Journal of Architecture and Civil Engineering. 2024. doi:10.35629/8193-09090110
BibTeX
@article{Devie2024,
author = {Devie, Nur Cahaya and Nurjaman, Hari Nugraha and Suryani, Fitri},
title = {Subcontractor / Foreman Procurement Management Strategy for Building Projects on Quality and Time Performance (Case Study: PT WIKA Gedung, Tbk)},
journal = {Journal of Architecture and Civil Engineering},
year = {2024},
doi = {10.35629/8193-09090110}
}
EUVIMED