WBS-Pareto-ABC and CPI Model for Pre-Construction Cost Control of A-KRIS Hospital Building
Journal of Infrastructure and Civil Engineering · 21.07.2026 · 6 (2) · 212-228
DOI: 10.35583/jice.v6i2.195 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Infrastructure and Civil Engineering, online erschienen am 21.07.2026. Verfasst von Endah Atika und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Pre-construction cost control in hospital ward completion projects requires a systematic approach capable of identifying cost concentration before construction begins because healthcare rehabilitation works involve complex interations among MEP-HVAC, sanitation, air-conditioning systems and functional building components. This study aims to develop a novel pre-construction cost control framework by integrating the Work Breakdown Structure (WBS), Pareto-ABC analysis, Area Cost Index (ACI) and a newly proposed Control Priority Index (CPI) for the A-KRIS Hospital Building completion project at RSUD Hj. Anna Lasmanah Banjarnegara. A quantitative descriptive case study was conducted through Bill of Quantity (BoQ) validation, WBS mapping, cost aggregation by work zone and sub-work, area cost index calculation, Pareto-ABC classification, and CPI formulation. The project cost was IDR 930,571,644 (including 11% VAT), with an area cost index of IDR 606,093/m2. Cost distribution was highly concentrated in Teratai Ward (60.18%) and Soka Ward (39.10%) accounted for 78.78% of the total project cost. The proposed CPI further differentiates priority among high-cost work items by integrating cost contribution, zone dominance, ABC classification, and optional technical risk, enabling more targeted prioritization of AHU isolation, air-conditioning, sanitation, piping, aluminium works and nurse station components. Unlike conventional Pareto-ABC analysis, which prioritizes work items solely based on cumulative cost, the proposed WBS-Pareto-ABC-CPI framework provides a structured decision-support model that links cost concentration with managerial control priorities during the pre-construction stage. The framework contributes to construction management by transforming conventional BoQ data into a practical and replicable tool for preventive cost, procurement, quality, schedule and safety control that can be applied tohospital rehabilitazion and other public-building projects.
Zitieren
APA
Atika, E., Hermawan, H., & Sibyan, H. (2026). WBS-Pareto-ABC and CPI Model for Pre-Construction Cost Control of A-KRIS Hospital Building. Journal of Infrastructure and Civil Engineering, 6(2), 212-228. https://doi.org/10.35583/jice.v6i2.195
Vancouver
Atika E, Hermawan H, Sibyan H. WBS-Pareto-ABC and CPI Model for Pre-Construction Cost Control of A-KRIS Hospital Building. Journal of Infrastructure and Civil Engineering. 2026;6(2):212-228. doi:10.35583/jice.v6i2.195
BibTeX
@article{Atika2026,
author = {Atika, Endah and Hermawan, Hermawan and Sibyan, Hidayatus},
title = {WBS-Pareto-ABC and CPI Model for Pre-Construction Cost Control of A-KRIS Hospital Building},
journal = {Journal of Infrastructure and Civil Engineering},
year = {2026},
volume = {6},
number = {2},
pages = {212--228},
doi = {10.35583/jice.v6i2.195}
}
EUVIMED