EVALUASI TEKNIS SISTEM FOTOVOLTAIK HIBRIDA OFF-GRID UNTUK SUBSTITUSI DAYA PEMAKAIAN SENDIRI PADA INSTALASI WTP PLTU MALINAU
Elektrika Borneo · 03.09.2025 · 11 (2) · 83-88
DOI: 10.35334/eb.v11i2.6829 ↗Kurz gefasst
Fachartikel in der Zeitschrift Elektrika Borneo, online erschienen am 03.09.2025. Verfasst von Muhammad Arif und 2 weiteren Autor:innen.
Abstract (Originalsprache)
A standalone hybrid photovoltaic (PV) system integrated with lithium-ion battery storage was designed and evaluated to substitute the auxiliary power demand of the Water Treatment Plant (WTP) at the Malinau Coal-Fired Power Plant (2x3 MW), North Kalimantan, Indonesia. Through PVsyst 8.0 simulations utilizing local irradiance, load profile, and shading parameters, the system achieved an annual solar fraction of 94.3% and a performance ratio (PR) of 67.91%, delivering 120.13 MWh/year of useful energy. Battery round-trip efficiency reached 94.9%, indicating minimal energy loss during storage. These results demonstrate the system's technical viability for replacing fossil-based auxiliary energy in tropical industrial settings. Further implications include cost savings, emission reduction, and enhanced reliability.
Zitieren
APA
Arif, M., Wibowo, E., & Nurdin, M. F. (2025). EVALUASI TEKNIS SISTEM FOTOVOLTAIK HIBRIDA OFF-GRID UNTUK SUBSTITUSI DAYA PEMAKAIAN SENDIRI PADA INSTALASI WTP PLTU MALINAU. Elektrika Borneo, 11(2), 83-88. https://doi.org/10.35334/eb.v11i2.6829
Vancouver
Arif M, Wibowo E, Nurdin MF. EVALUASI TEKNIS SISTEM FOTOVOLTAIK HIBRIDA OFF-GRID UNTUK SUBSTITUSI DAYA PEMAKAIAN SENDIRI PADA INSTALASI WTP PLTU MALINAU. Elektrika Borneo. 2025;11(2):83-88. doi:10.35334/eb.v11i2.6829
BibTeX
@article{Arif2025,
author = {Arif, Muhammad and Wibowo, Eri and Nurdin, Muhammad Firdan},
title = {EVALUASI TEKNIS SISTEM FOTOVOLTAIK HIBRIDA OFF-GRID UNTUK SUBSTITUSI DAYA PEMAKAIAN SENDIRI PADA INSTALASI WTP PLTU MALINAU},
journal = {Elektrika Borneo},
year = {2025},
volume = {11},
number = {2},
pages = {83--88},
doi = {10.35334/eb.v11i2.6829}
}
EUVIMED