Evaluating Cost Performance and Unit Rate Optimization in Surface Maintenance Operation (SMO) Earthwork Service Contracts

Alexander Alexander, Darmawan Pontan, Efa Ayu Nabila, Lunatari Sanbella

IAIC Transactions on Sustainable Digital Innovation (ITSDI) · 15.10.2025 · 7 (1) · 51-60

DOI: 10.34306/itsdi.v7i1.705 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IAIC Transactions on Sustainable Digital Innovation (ITSDI), online erschienen am 15.10.2025. Verfasst von Alexander Alexander und 3 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Surface Maintenance Operation (SMO) Construction Services Work Unit Rate Earthwork (WUR EW) project in the Rokan Block, Indonesia, utilizes a unit price contract model with hypothetical volumes. This contractual model transfers the risk of uncertain work quantities from the project owner to the contractor. This study aims to analyze the characteristics of this contract and formulate a secure strategy for preparing bidding prices and managing construction costs. The research employed a quantitative analysis of historical data from two work packages (Package 3 and Mitigation Package 3). The analysis was conducted through the calculation of Key Performance Indicators (KPIs) such as the Cost Performance Index (CPI) and Budget Variance (BV), as well as Cost and Quantity Variance Analysis per work item. The results indicate that both projects achieved excellent cost performance, exceeding the planned profit targets (Realized CPI > Planned CPI). The most effective strategy was to set a high profit percentage on the top 10 Earthwork & Civil items (the Pareto items), which experienced significant volume increases and were the main drivers of the total profit growth.

Zitieren

APA

Alexander, A., Pontan, D., Nabila, E. A., & Sanbella, L. (2025). Evaluating Cost Performance and Unit Rate Optimization in Surface Maintenance Operation (SMO) Earthwork Service Contracts. IAIC Transactions on Sustainable Digital Innovation (ITSDI), 7(1), 51-60. https://doi.org/10.34306/itsdi.v7i1.705

Vancouver

Alexander A, Pontan D, Nabila EA, Sanbella L. Evaluating Cost Performance and Unit Rate Optimization in Surface Maintenance Operation (SMO) Earthwork Service Contracts. IAIC Transactions on Sustainable Digital Innovation (ITSDI). 2025;7(1):51-60. doi:10.34306/itsdi.v7i1.705

BibTeX
@article{Alexander2025,
  author = {Alexander, Alexander and Pontan, Darmawan and Nabila, Efa Ayu and Sanbella, Lunatari},
  title = {Evaluating Cost Performance and Unit Rate Optimization in Surface Maintenance Operation (SMO) Earthwork Service Contracts},
  journal = {IAIC Transactions on Sustainable Digital Innovation (ITSDI)},
  year = {2025},
  volume = {7},
  number = {1},
  pages = {51--60},
  doi = {10.34306/itsdi.v7i1.705}
}
Kostenlos starten →