EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Optimasi Time Frame Capacity Unschedule Maintenance Studi Kasus Disbonding Aft Flap Outboard Trailing Edge Flap

Muhammad Alfandy Pramana Lubis, Ellyawan Setyo Arbintarso, Toto Rusianto

Jurnal Teknologi · 12.06.2026 · 19 (1) · 46-52

DOI: 10.34151/jurtek.v19i1.5519 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Teknologi, online erschienen am 12.06.2026. Verfasst von Muhammad Alfandy Pramana Lubis und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study aims to analyze and optimize the time frame capacity for unscheduled maintenance in cases of disbonding damage on the aft flap assembly outboard trailing edge flap components of the Boeing 737-NG aircraft. The sandwich composite structure commonly used in these components is susceptible to internal invisible damage that directly impacts flight safety. Through an optimization approach of manpower and time at the composite shop of PT Batam Aero Technic, this research evaluates the critical path of repairs, process bottlenecks, and formulates a hybrid Reliability-Centered Maintenance (RCM) and Time-Based Maintenance (TBM) model. The analysis results show that the optimal capacity of the composite shop is 4 units per month with a Turn Around Time (TAT) of 7 working days and an estimated workload of 88 man-hours per aircraft. The actual workload was recorded at 44 hours, divided into inspection, repair (longest phase: 59.09%), and painting. The implementation of the Hybrid RCM-TBM strategy can project a 40-60% reduction in unscheduled maintenance frequency, making the maintenance shop utility more predictable, increasing aircraft availability, and reducing the workload of mechanics so that the work is more efficient.

Zitieren

APA

Lubis, M. A. P., Arbintarso, E. S., & Rusianto, T. (2026). Optimasi Time Frame Capacity Unschedule Maintenance Studi Kasus Disbonding Aft Flap Outboard Trailing Edge Flap. Jurnal Teknologi, 19(1), 46-52. https://doi.org/10.34151/jurtek.v19i1.5519

Vancouver

Lubis MAP, Arbintarso ES, Rusianto T. Optimasi Time Frame Capacity Unschedule Maintenance Studi Kasus Disbonding Aft Flap Outboard Trailing Edge Flap. Jurnal Teknologi. 2026;19(1):46-52. doi:10.34151/jurtek.v19i1.5519

BibTeX
@article{Lubis2026,
  author = {Lubis, Muhammad Alfandy Pramana and Arbintarso, Ellyawan Setyo and Rusianto, Toto},
  title = {Optimasi Time Frame Capacity Unschedule Maintenance Studi Kasus Disbonding Aft Flap Outboard Trailing Edge Flap},
  journal = {Jurnal Teknologi},
  year = {2026},
  volume = {19},
  number = {1},
  pages = {46--52},
  doi = {10.34151/jurtek.v19i1.5519}
}
Kostenlos starten →