Comparative Analysis Of Aggregate Production Planning Strategies (Pure Level, Chase, and Mixed) In The Gum Rosin And Turpentine Industry
Jurnal Civil Engineering Study · 29.03.2026 · 6 (01) · 372-380
DOI: 10.34001/ces.v6i01.1787 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Civil Engineering Study, online erschienen am 29.03.2026. Verfasst von Taftsa Aulia Gholamreza Rahman und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
This study analyzes and compares three aggregate production planning (APP) strategies—Pure Level, Chase, and Mixed Strategy—in a gum rosin and turpentine industry characterized by seasonal raw material availability and fluctuating demand. The research aims to identify the most cost-efficient and operationally sustainable production strategy. A case study approach was employed using primary data from observations and interviews, as well as secondary data from production records, workforce schedules, inventory data, and demand forecasts over a five-month planning horizon. Each strategy was modeled and evaluated based on total production cost, production stability, and demand fulfillment. The results indicate that the Pure Level Strategy yields the lowest total cost of IDR 197,944,270.38 by maintaining a constant production rate and minimizing labor adjustment costs, despite incurring moderate inventory holding costs. In contrast, the Chase Strategy significantly increases total cost due to frequent hiring and firing, while the Mixed Strategy results in the highest cost because of overtime and inventory expenses. The findings demonstrate that, under conditions of high capacity adjustment costs and seasonal raw material supply, a stable production strategy is more economically advantageous. This study contributes empirical evidence to aggregate production planning literature in forestry-based chemical industries and highlights the importance of contextual factors in determining optimal production strategies.
Zitieren
APA
Rahman, T. A. G., & Mubin, A. (2026). Comparative Analysis Of Aggregate Production Planning Strategies (Pure Level, Chase, and Mixed) In The Gum Rosin And Turpentine Industry. Jurnal Civil Engineering Study, 6(01), 372-380. https://doi.org/10.34001/ces.v6i01.1787
Vancouver
Rahman TAG, Mubin A. Comparative Analysis Of Aggregate Production Planning Strategies (Pure Level, Chase, and Mixed) In The Gum Rosin And Turpentine Industry. Jurnal Civil Engineering Study. 2026;6(01):372-380. doi:10.34001/ces.v6i01.1787
BibTeX
@article{Rahman2026,
author = {Rahman, Taftsa Aulia Gholamreza and Mubin, Ahmad},
title = {Comparative Analysis Of Aggregate Production Planning Strategies (Pure Level, Chase, and Mixed) In The Gum Rosin And Turpentine Industry},
journal = {Jurnal Civil Engineering Study},
year = {2026},
volume = {6},
number = {01},
pages = {372--380},
doi = {10.34001/ces.v6i01.1787}
}
EUVIMED