Analisis Deviasi Produktivitas Tenaga Kerja pada Pekerjaan Struktur Balok dan Kolom Gedung Gizi di Kediri Berdasarkan Standar Permen PUPR 2023
Jurnal Civil Engineering Study · 11.03.2026 · 6 (01) · 82-93
DOI: 10.34001/ces.v6i01.1639 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Civil Engineering Study, online erschienen am 11.03.2026. Verfasst von Fifi Novaria und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
Labor productivity significantly affects the efficiency and success of construction projects. This study aims to evaluate the deviation of actual labor productivity on-site compared to the standards set by Permen PUPR No. 8 of 2023 for reinforcement, formwork, and concrete works for column and beam elements. A descriptive quantitative approach was employed, with labor productivity measured through direct observation and compared to the national standards. The results revealed that reinforcement work had a significant negative deviation (−54%), while formwork and concrete work showed smaller deviations, with concrete beam work exceeding the Permen PUPR 2023 standard (+155%). The primary causes of deviation in reinforcement were the use of manual methods and variability in worker skills, while in concrete and formwork, efficiency was more influenced by the use of mechanical aids and the implementation of standardized work systems. It is recommended to improve worker skills, expand the use of mechanical aids, and implement daily productivity monitoring to reduce deviations from the Permen PUPR 2023 standard. This study contributes to the optimization of labor and equipment use in construction projects.
Zitieren
APA
Novaria, F., & Susanto, S. (2026). Analisis Deviasi Produktivitas Tenaga Kerja pada Pekerjaan Struktur Balok dan Kolom Gedung Gizi di Kediri Berdasarkan Standar Permen PUPR 2023. Jurnal Civil Engineering Study, 6(01), 82-93. https://doi.org/10.34001/ces.v6i01.1639
Vancouver
Novaria F, Susanto S. Analisis Deviasi Produktivitas Tenaga Kerja pada Pekerjaan Struktur Balok dan Kolom Gedung Gizi di Kediri Berdasarkan Standar Permen PUPR 2023. Jurnal Civil Engineering Study. 2026;6(01):82-93. doi:10.34001/ces.v6i01.1639
BibTeX
@article{Novaria2026,
author = {Novaria, Fifi and Susanto, Sony},
title = {Analisis Deviasi Produktivitas Tenaga Kerja pada Pekerjaan Struktur Balok dan Kolom Gedung Gizi di Kediri Berdasarkan Standar Permen PUPR 2023},
journal = {Jurnal Civil Engineering Study},
year = {2026},
volume = {6},
number = {01},
pages = {82--93},
doi = {10.34001/ces.v6i01.1639}
}
EUVIMED