Inspection of overhead lifting structure crane runways. Problem statement and possible solutions
Glavnyj mekhanik (Chief Mechanic) · 30.09.2025 · (10) · 34-38
DOI: 10.33920/pro-2-2510-05 ↗Kurz gefasst
Fachartikel in der Zeitschrift Glavnyj mekhanik (Chief Mechanic), online erschienen am 30.09.2025. Verfasst von P.V. Churbanov und 3 weiteren Autor:innen. Die Arbeit nennt 4 Literaturangaben.
Abstract (Originalsprache)
This article is presented by Severstal Group of Companies and presents the results of the practical implementation of overhead lifting structure inspection methods. The authors demonstrate their collaboration with developers and potential equipment suppliers to comprehensively assess the condition of overhead lifting structure runways. Based on the results of this collaborative work, key areas for potential project implementation were developed. The problem posed in this article has not been fully resolved. Further work on this topic is expected in the next issue.
Zitieren
APA
Churbanov, P., Konoplev, A., Fedyanov, S., & Smirnov, I. (2025). Inspection of overhead lifting structure crane runways. Problem statement and possible solutions. Glavnyj mekhanik (Chief Mechanic), 34-38. https://doi.org/10.33920/pro-2-2510-05
Vancouver
Churbanov P, Konoplev A, Fedyanov S, Smirnov I. Inspection of overhead lifting structure crane runways. Problem statement and possible solutions. Glavnyj mekhanik (Chief Mechanic). 2025:34-38. doi:10.33920/pro-2-2510-05
BibTeX
@article{Churbanov2025,
author = {Churbanov, P.V. and Konoplev, A.M. and Fedyanov, S.A. and Smirnov, I.D.},
title = {Inspection of overhead lifting structure crane runways. Problem statement and possible solutions},
journal = {Glavnyj mekhanik (Chief Mechanic)},
year = {2025},
number = {10},
pages = {34--38},
doi = {10.33920/pro-2-2510-05}
}
EUVIMED