Fault Ride-Through Enhancement of a 9 MW DFIG Wind Farm Using a Dual-Layer STATCOM and Multi-Tier Protection Scheme: Detailed and Reduced-Order Modelling

Muhammed Anaz Khan, Abdullatif Hakami, Abdulrahman Salem Ali Alghamdi, Abdullah Mohammad Saeed Altarqi, Suhail Abduallah Ihsan Emam

Wind · 05.08.2026 · 6 (3) · 39

DOI: 10.3390/wind6030039 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Wind, online erschienen am 05.08.2026. Verfasst von Muhammed Anaz Khan und 4 weiteren Autor:innen. Die Arbeit nennt 66 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: University of Bisha.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The doubly fed induction generator (DFIG) dominates the wind energy market, yet its direct stator-to-grid connection makes it vulnerable to grid faults, creating a tension between hardware self-protection and grid-code fault ride-through (FRT) compliance. This paper presents the modelling and FRT analysis of a 9 MW DFIG wind farm combining a 20 MVA Static Synchronous Compensator (STATCOM) with a ten-tier algorithmic protection scheme. A detailed phasor-domain MATLAB/Simulink R2024b model is complemented by physics-based reduced-order models integrated in Python, separating calibration targets, calibration-dependent derived quantities and quantities independent of the DC-link calibration. The aerodynamic model reproduces the power coefficient maximum of 0.48 at a tip–speed ratio of 8.1. The energy-balance model uses two parameters identified per scenario from the detailed DC-link trajectory; its peak-voltage agreement within 0.4% is therefore a calibrated consistency check, while the derived arming times, slopes, chopper sizing and latency budget remain conditional on that calibration. A first-order Thevenin analysis shows that the STATCOM supports a weak 25 kV point of common coupling of order 53 MVA short-circuit level, not the 2500 MVA source. The approximate 0.50-to-0.78 p.u. recovery requires about 29.7 Mvar and 1.90 p.u. of STATCOM rated current for 150 ms, conditional on an assumed short-time envelope and adequate converter-voltage headroom; it is not attributable to continuous rated operation. FRT support for the selected recoverable dip is separated from converter survival during a zero-impedance fault, for which a 1700 V chopper pickup with a 1 ms gate delay, not the 10 ms isolation command, is the clamping mechanism. The assessment is explicitly conditional and requires electromagnetic-transient and hardware-in-the-loop confirmation.

Förderung

  • University of Bisha

Zitieren

APA

Khan, M. A., Hakami, A., Alghamdi, A. S. A., Altarqi, A. M. S., & Emam, S. A. I. (2026). Fault Ride-Through Enhancement of a 9 MW DFIG Wind Farm Using a Dual-Layer STATCOM and Multi-Tier Protection Scheme: Detailed and Reduced-Order Modelling. Wind, 6(3), 39. https://doi.org/10.3390/wind6030039

Vancouver

Khan MA, Hakami A, Alghamdi ASA, Altarqi AMS, Emam SAI. Fault Ride-Through Enhancement of a 9 MW DFIG Wind Farm Using a Dual-Layer STATCOM and Multi-Tier Protection Scheme: Detailed and Reduced-Order Modelling. Wind. 2026;6(3):39. doi:10.3390/wind6030039

BibTeX
@article{Khan2026,
  author = {Khan, Muhammed Anaz and Hakami, Abdullatif and Alghamdi, Abdulrahman Salem Ali and Altarqi, Abdullah Mohammad Saeed and Emam, Suhail Abduallah Ihsan},
  title = {Fault Ride-Through Enhancement of a 9 MW DFIG Wind Farm Using a Dual-Layer STATCOM and Multi-Tier Protection Scheme: Detailed and Reduced-Order Modelling},
  journal = {Wind},
  year = {2026},
  volume = {6},
  number = {3},
  pages = {39},
  doi = {10.3390/wind6030039}
}