EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport Hub

Yinghua Wei, Lei Chen, Dewei Mu, Hao Lu, Lihua Deng, Qin Zhou, Jinchao He

Water · 23.11.2026 · 18 (23) · 2925

DOI: 10.3390/w18232925 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Water, online erschienen am 23.11.2026. Verfasst von Yinghua Wei und 6 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Fundamental Research Funds for the Central Universities, National Key Research and Development Program of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Pipe enlargement can change hydraulic performance without producing a corresponding change in road availability. This study coupled a complete SWMM dual-drainage model of the Chongqing East Station area, containing 560 original stormwater pipes, with a physical-road graph of 577 nodes and 605 roads. For R50, R100 and R200 rainfall scenarios, the maximum numbers of roads closed at a 0.30 m mean-depth threshold were 13, 16 and 21, respectively. The corresponding blocked-road length–time losses were 0.3049, 0.3510 and 0.4105 km·h. Five successive R200 pipe-enlargement states were then compared with the baseline using a fixed score dominated by cumulative nodal overflow. All five states increased this score, so the baseline was retained. However, several enlargement states reduced road disruption; state 5 reduced length–time loss by 7.06% at the 0.30 m threshold. At a shallower 0.15 m threshold, some enlargement states increased road disruption. The three road-depth definitions also produced different cumulative losses, although no road in the three baseline cases exceeded 0.30 m at 360 min. These results show how the choice of evaluation measure can change the assessment of pipe enlargement and support considering road-network effects in drainage planning.

Förderung

  • Fundamental Research Funds for the Central Universities
  • National Key Research and Development Program of China

Zitieren

APA

Wei, Y., Chen, L., Mu, D., Lu, H., Deng, L., Zhou, Q., & He, J. (2026). Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport Hub. Water, 18(23), 2925. https://doi.org/10.3390/w18232925

Vancouver

Wei Y, Chen L, Mu D, Lu H, Deng L, Zhou Q, et al. Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport Hub. Water. 2026;18(23):2925. doi:10.3390/w18232925

BibTeX
@article{Wei2026,
  author = {Wei, Yinghua and Chen, Lei and Mu, Dewei and Lu, Hao and Deng, Lihua and Zhou, Qin and He, Jinchao},
  title = {Complete Network Assessment of Road Disruption and Heuristic Pipe Sizing in a Mountainous Transport Hub},
  journal = {Water},
  year = {2026},
  volume = {18},
  number = {23},
  pages = {2925},
  doi = {10.3390/w18232925}
}
Kostenlos starten →