Fachartikel in der Zeitschrift Water, online erschienen am 17.11.2026. Verfasst von Hui Li und 3 weiteren Autor:innen. Die Arbeit nennt 46 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation Joint Fund of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Riverbank erosion constitutes a prevalent phenomenon in fluvial alluvial systems and often leads to hydrogeological hazards such as bank failure and soil loss. In contrast to open-channel flow conditions, the mechanisms of bank erosion during ice-covered periods are more complex. Therefore, investigating riverbank slope stability under ice-covered conditions is essential for bank protection, riverbed evolution analysis, and river regulation in ice-affected rivers. In the present study, based on soil mechanics theory, an analytical mechanical equilibrium framework is established to formulate the stability equation for cohesive riverbanks under ice-covered conditions. Key parameters are investigated, including the critical bank height ratio, riverbed scouring depth, and lateral erosion distance under varying ice-cover thicknesses and stress conditions during the initial and stable freeze-up periods. The established equation is verified using river width data derived from satellite imagery and is applied to the Inner-Mongolia reach of the Yellow River, showing good agreement with monitored field results. The calculated results indicate that, compared with open-channel flow scenarios, ice cover alters the near-bank flow field to increase the hydrodynamic scour potential at the bank toe, while raising the critical failure threshold of riverbanks and permitting a greater scour magnitude before bank failure. Furthermore, the downstream segments of the Inner-Mongolia Reach exhibit a higher pre-failure scour threshold under ice-covered conditions than upstream areas. Taking the Toudaoguai cross-section as an example, under a 0.6-m-thick ice cover and a 50 kPa ice stress, compared with open-channel flow, the initial critical bank height ratio increases by 0.2350 (22.1%), the allowable riverbed scouring depth before failure increases by 0.7050 m (364.2%), and the allowable lateral deformation increment increases by 0.4826 m (332.6%).

Förderung

  • National Natural Science Foundation Joint Fund of China

Zitieren

APA

Li, H., Zhang, Z., Wang, J., & Sui, J. (2026). Mechanisms of Channel Bank Erosion During Ice-Covered Periods. Water, 18(22), 2873. https://doi.org/10.3390/w18222873

Vancouver

Li H, Zhang Z, Wang J, Sui J. Mechanisms of Channel Bank Erosion During Ice-Covered Periods. Water. 2026;18(22):2873. doi:10.3390/w18222873

BibTeX
@article{Li2026,
  author = {Li, Hui and Zhang, Zhenhua and Wang, Jun and Sui, Jueyi},
  title = {Mechanisms of Channel Bank Erosion During Ice-Covered Periods},
  journal = {Water},
  year = {2026},
  volume = {18},
  number = {22},
  pages = {2873},
  doi = {10.3390/w18222873}
}