Integrated Hydraulic and Biological Monitoring Reveals Stage-Specific Passage Performance in a Vertical-Slot Fishway in the Upper Yangtze River
Water · 22.10.2026 · 18 (21) · 2632
DOI: 10.3390/w18212632 ↗Kurz gefasst
Fachartikel in der Zeitschrift Water, online erschienen am 22.10.2026. Verfasst von Lisha Zhou und 4 weiteren Autor:innen. Die Arbeit nennt 32 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: the National Key Science and Technology Program.
Abstract (Originalsprache)
Dams fragment river networks, but post-construction evaluations of fishways often treat hydraulic suitability and biological performance separately. We assessed a 1486-m-long vertical-slot fishway comprising 326 pools at the Jinsha Hydropower Station in the upper Yangtze River during its first operating season. The assessment integrated upstream and downstream fish-assemblage surveys, as-built geometric inspection, field hydraulic measurements, diagnostic three-dimensional computational fluid dynamics (CFD), underwater video, block-net sampling, and passive integrated transponder (PIT) telemetry of 95 fish representing 12 species. Pre-commissioning inspection revealed substantial deviations in vertical-slot width, which were corrected before operation. Mean measured entrance velocity was approximately 0.40 m/s and representative slot velocities were 0.90–1.08 m/s; diagnostic CFD reproduced slot-jet velocity magnitudes of approximately 0.9–1.1 m/s and indicated localized flow-acceleration magnitudes of approximately 1.9 m/s2 near slot transitions. PIT detections declined from 57 fish at the downstream monitoring checkpoint (T1) to 34 at an intermediate dam-site checkpoint (T2) and 12 at the upstream-exit checkpoint (T3). Accordingly, 60.0% of released fish were detected at T1, 21.1% of fish detected at T1 subsequently reached T3, and 12.6% of all released fish reached T3 from the release location within the monitoring period. The combination of broadly acceptable representative velocities with a low observed route-completion proportion within the PIT-tagged experimental group indicates that compliance with nominal hydraulic criteria alone is insufficient for evaluating long fishways. The progressive decline in PIT detections, local hydraulic heterogeneity, as-built geometric variability, and unoptimized operation emerged as priority hypotheses for adaptive testing. Post-construction evaluation should therefore couple structural quality control and stage-specific biological monitoring with controlled operational trials of attraction flow, gate settings, and water levels.
Förderung
- the National Key Science and Technology Program
Zitieren
APA
Zhou, L., Li, J., Huang, H., Wu, Z., & Li, Y. (2026). Integrated Hydraulic and Biological Monitoring Reveals Stage-Specific Passage Performance in a Vertical-Slot Fishway in the Upper Yangtze River. Water, 18(21), 2632. https://doi.org/10.3390/w18212632
Vancouver
Zhou L, Li J, Huang H, Wu Z, Li Y. Integrated Hydraulic and Biological Monitoring Reveals Stage-Specific Passage Performance in a Vertical-Slot Fishway in the Upper Yangtze River. Water. 2026;18(21):2632. doi:10.3390/w18212632
BibTeX
@article{Zhou2026,
author = {Zhou, Lisha and Li, Jia and Huang, Hongdong and Wu, Zihan and Li, Yong},
title = {Integrated Hydraulic and Biological Monitoring Reveals Stage-Specific Passage Performance in a Vertical-Slot Fishway in the Upper Yangtze River},
journal = {Water},
year = {2026},
volume = {18},
number = {21},
pages = {2632},
doi = {10.3390/w18212632}
}
EUVIMED