EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Development of Integrated Geomorphological and Hydrological GIS Platform for Prospective Dam Site Analysis

Kwan Tun Lee, Yu-Han Hsu, Meng-Chiu Hung, Pin-Chun Huang, Ta-Chun Chien, Yi-Ting Lin, Yu-Hsun Liao, Nai-Kuang Chen, Ching-Wen Hsu, Ciao-Ru Li, Cho-Min Yang, Lo-Ya Chen und 5 weitere

Water · 01.07.2026 · 18 (13) · 1596

DOI: 10.3390/w18131596 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Water, online erschienen am 01.07.2026. Verfasst von Kwan Tun Lee und 16 weiteren Autor:innen. Die Arbeit nennt 32 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Water Resources Agency in Taiwan.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Constructing new reservoirs to ensure a reliable water supply in downstream areas and to alleviate overflow flooding along rivers during floods is an urgent task for the authorities. In this study, we developed a GIS platform that integrates a series of watershed geomorphological and hydrological models to assess the suitability of prospective dam sites. The built-in modules include watershed geomorphological analysis, rainfall analysis, flow analysis, surplus water analysis, and reservoir analysis. Using the digital elevation model, users can obtain the reservoir H-A-V curve at a prospective dam site and the upstream watershed’s geomorphological factors. A topography-based hydrological model was used to estimate available water at the dam site, and surplus water was obtained by subtracting existing water demands and/or environmental flow requirements from the available water series. Exceedance probability analysis was then conducted for the surplus water to evaluate the dam site’s feasibility for new water resources development. The system also provides a reservoir’s useful-life evaluation to determine the time required for sediment accumulation to render the reservoir unable to serve its intended purpose. Moreover, for flood control, the platform includes a built-in module for estimating design discharge for different return periods. The planned Pingxi Reservoir site in New Taipei County, Taiwan, is used as an example in this study. Detailed analytical procedures are presented to demonstrate the use of the proposed integrated GIS platform system to assess the adequacy of prospective dam sites for new water resources development.

Förderung

  • Water Resources Agency in Taiwan

Zitieren

APA

Lee, K. T., Hsu, Y., Hung, M., Huang, P., Chien, T., Lin, Y., Liao, Y., Chen, N., Hsu, C., Li, C., Yang, C., Chen, L., Chen, J., Ho, J., Lin, H., Lin, Y., & Tsai, X. (2026). Development of Integrated Geomorphological and Hydrological GIS Platform for Prospective Dam Site Analysis. Water, 18(13), 1596. https://doi.org/10.3390/w18131596

Vancouver

Lee KT, Hsu Y, Hung M, Huang P, Chien T, Lin Y, et al. Development of Integrated Geomorphological and Hydrological GIS Platform for Prospective Dam Site Analysis. Water. 2026;18(13):1596. doi:10.3390/w18131596

BibTeX
@article{Lee2026,
  author = {Lee, Kwan Tun and Hsu, Yu-Han and Hung, Meng-Chiu and Huang, Pin-Chun and Chien, Ta-Chun and Lin, Yi-Ting and Liao, Yu-Hsun and Chen, Nai-Kuang and Hsu, Ching-Wen and Li, Ciao-Ru and Yang, Cho-Min and Chen, Lo-Ya and Chen, Jia-Qian and Ho, Jui-Yi and Lin, He-Chung and Lin, You-Huei and Tsai, Xiaoang},
  title = {Development of Integrated Geomorphological and Hydrological GIS Platform for Prospective Dam Site Analysis},
  journal = {Water},
  year = {2026},
  volume = {18},
  number = {13},
  pages = {1596},
  doi = {10.3390/w18131596}
}
Kostenlos starten →