Construction-Induced Waterlogging Simulation in Pinglu Canal Using a Coupled SWMM-HEC-RAS Model: Implications for Inland Waterway Engineering

Jingwen Li, Jiangdong Feng, Qingyang Wang, Yongtao Zhang

Water · 15.08.2025 · 17 (16) · 2415

DOI: 10.3390/w17162415 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Water, online erschienen am 15.08.2025. Verfasst von Jingwen Li und 3 weiteren Autor:innen. Die Arbeit wurde bisher 7-mal zitiert (Crossref) und nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Guangxi Young and Middle-aged Teachers’ Basic Scientific Research Ability Improvement Project, Guangxi Key Laboratory of Spatial Information and Geomatics Program, Guilin University of Technology Research Development Fund.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Focusing on the Lingshan section of Guangxi’s Pinglu Canal, this study addresses frequent waterlogging during construction under subtropical monsoon rainfall. Human disturbances alter hydrological processes, causing project delays and economic losses. We developed a coupled Storm Water Management Model (SWMM 1D hydrological) and Hydrologic Engineering Center—River Analysis System 2D (HEC-RAS 2D hydrodynamic) model. High-resolution Unmanned Aerial Vehicle—Light Detection and Ranging (UAV-LiDAR) Digital Elevation Model (DEM) delineated sub-catchments, while the Green-Ampt model quantified soil conductivity decay. Synchronized runoff data drove high-resolution HEC-RAS 2D simulations of waterlogging evolution under design storms (1–100-year return periods) and a real event (10 May 2025). Key results: Water depth exhibits nonlinear growth with return period—slow at low intensities but accelerating beyond 50-year events, particularly at temporary road junctions where embankments impede flow. Additionally, intensive intermittent rainfall causes significant ponding at excavation pit-road intersections, and optimized drainage drastically shortens recession time. The study reveals a “rapid runoff generation–restricted convergence–prolonged ponding” mechanism under construction disturbance, validates the model’s capability for complex scenarios, and provides critical data for real-time waterlogging risk prediction and drainage optimization during the canal’s construction.

Förderung

  • Guangxi Young and Middle-aged Teachers’ Basic Scientific Research Ability Improvement Project
  • Guangxi Key Laboratory of Spatial Information and Geomatics Program
  • Guilin University of Technology Research Development Fund
  • Qingmiao Talent Research Project Funding

Zitieren

APA

Li, J., Feng, J., Wang, Q., & Zhang, Y. (2025). Construction-Induced Waterlogging Simulation in Pinglu Canal Using a Coupled SWMM-HEC-RAS Model: Implications for Inland Waterway Engineering. Water, 17(16), 2415. https://doi.org/10.3390/w17162415

Vancouver

Li J, Feng J, Wang Q, Zhang Y. Construction-Induced Waterlogging Simulation in Pinglu Canal Using a Coupled SWMM-HEC-RAS Model: Implications for Inland Waterway Engineering. Water. 2025;17(16):2415. doi:10.3390/w17162415

BibTeX
@article{Li2025,
  author = {Li, Jingwen and Feng, Jiangdong and Wang, Qingyang and Zhang, Yongtao},
  title = {Construction-Induced Waterlogging Simulation in Pinglu Canal Using a Coupled SWMM-HEC-RAS Model: Implications for Inland Waterway Engineering},
  journal = {Water},
  year = {2025},
  volume = {17},
  number = {16},
  pages = {2415},
  doi = {10.3390/w17162415}
}
Kostenlos starten →