EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Elements and Processes Required for the Development of a Spring-Breakup Ice-Jam Flood Forecasting System (Churchill River, Atlantic Canada)

Karl-Erich Lindenschmidt, Robert Briggs, Amir Ali Khan, Thomas Puestow

Water · 29.05.2024 · 16 (11) · 1557

DOI: 10.3390/w16111557 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Water, online erschienen am 29.05.2024. Verfasst von Karl-Erich Lindenschmidt und 3 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 44 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Research Council of Canada.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Spring-breakup ice-jam floods are a major hazard for many rivers in cold regions. They can cause severe damage to infrastructure, property, and ecosystems along riverbanks. To reduce the risk and impact of these events, it is essential to develop reliable and timely forecasting systems that can provide early warning and guidance for mitigation actions. In this paper, we highlight the elements and processes required for the successful development of a spring-breakup ice-jam flood forecasting system, using the lower Churchill River in Labrador, Canada as a case study. We review the existing forecasting methodologies and systems for spring-breakup ice-jam floods and discuss their strengths and limitations. We then describe the case study of the lower Churchill River, where a large ice-jam flood occurred in May 2017, triggering an independent review and a series of recommendations for improving the flood preparedness and response. We present the main components and features of the forecasting system that was developed for the lower Churchill River, based on the recommendations from the independent review. We also discuss the improvements that were made to the forecasting system, such as parallelization, adaptation, and determination of ice-jam prone areas. Finally, we provide some conclusions and recommendations for future research and development of spring-breakup ice-jam flood forecasting systems, focusing on the requirements for a technical framework that incorporates community engagement and special considerations for regulated rivers.

Förderung

  • National Research Council of Canada

Zitieren

APA

Lindenschmidt, K., Briggs, R., Khan, A. A., & Puestow, T. (2024). Elements and Processes Required for the Development of a Spring-Breakup Ice-Jam Flood Forecasting System (Churchill River, Atlantic Canada). Water, 16(11), 1557. https://doi.org/10.3390/w16111557

Vancouver

Lindenschmidt K, Briggs R, Khan AA, Puestow T. Elements and Processes Required for the Development of a Spring-Breakup Ice-Jam Flood Forecasting System (Churchill River, Atlantic Canada). Water. 2024;16(11):1557. doi:10.3390/w16111557

BibTeX
@article{Lindenschmidt2024,
  author = {Lindenschmidt, Karl-Erich and Briggs, Robert and Khan, Amir Ali and Puestow, Thomas},
  title = {Elements and Processes Required for the Development of a Spring-Breakup Ice-Jam Flood Forecasting System (Churchill River, Atlantic Canada)},
  journal = {Water},
  year = {2024},
  volume = {16},
  number = {11},
  pages = {1557},
  doi = {10.3390/w16111557}
}
Kostenlos starten →