EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Fade Dynamics, Availability and Measurement Limits of a Tropical Ku-Band Earth–Space Link: What a Sensor Record Supports

Soemsak Yooyen, Tanawit Suteewong, Pattarapong Phasukkit, Pattharin Wichittrakarn, Nongluck Houngkamhang, Popphon Laon, Supavee Pourbunthidkul, Tanawit Sahavisit, Chusit Pradabpet, Yoshikazu Miyanaga

Technologies · 01.11.2026 · 14 (11) · 710

DOI: 10.3390/technologies14110710 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Technologies, online erschienen am 01.11.2026. Verfasst von Soemsak Yooyen und 9 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: King Mongkut's Institute of Technology Ladkrabang.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

What does a short sensor record support, and what do its faults cost? We retained 762 h of a 919-h wet-season window (40 calendar dates) on a 12-m Ku-band dish in Bangkok; Ku-band carries Internet-of-Things backhaul. The novelty is quantifying, on this record, the limits deciding which statistics hold: sampling uncertainty, the clear-sky reference, noise floor, receiver ceiling, time base, and the exclusion of 51% of gauge-wet against 15% of gauge-dry time. Claim-bearing statistics carry day–block bootstrap intervals, with four named exceptions. Level uncertainty is 22–52%, and ceiling-censored 0.1–0.2% levels are lower bounds. A key null result: over 16 rain days, ridge regression and gradient boosting on twelve weather-station and time-of-day inputs did not improve on a rain-rate-only power law; paired 95% intervals exclude gains above 0.58 dB. Fades above 3 dB last from one 30-s sample to ≥87 min. A 3-dB margin is met for 98.4% of retained time and 81.6–98.7% of wall-clock time, depending on how excluded time is counted. Late-afternoon 3-dB exceedance tops overnight by 3.85 percentage points [1.34, 6.91]. Time base, level uncertainty and censoring leave rain-attenuation prediction error unmeasurable. Practitioners get planning inputs for comparable Ku-band gateways; absolute levels need adjustment.

Förderung

  • King Mongkut's Institute of Technology Ladkrabang

Zitieren

APA

Yooyen, S., Suteewong, T., Phasukkit, P., Wichittrakarn, P., Houngkamhang, N., Laon, P., Pourbunthidkul, S., Sahavisit, T., Pradabpet, C., & Miyanaga, Y. (2026). Fade Dynamics, Availability and Measurement Limits of a Tropical Ku-Band Earth–Space Link: What a Sensor Record Supports. Technologies, 14(11), 710. https://doi.org/10.3390/technologies14110710

Vancouver

Yooyen S, Suteewong T, Phasukkit P, Wichittrakarn P, Houngkamhang N, Laon P, et al. Fade Dynamics, Availability and Measurement Limits of a Tropical Ku-Band Earth–Space Link: What a Sensor Record Supports. Technologies. 2026;14(11):710. doi:10.3390/technologies14110710

BibTeX
@article{Yooyen2026,
  author = {Yooyen, Soemsak and Suteewong, Tanawit and Phasukkit, Pattarapong and Wichittrakarn, Pattharin and Houngkamhang, Nongluck and Laon, Popphon and Pourbunthidkul, Supavee and Sahavisit, Tanawit and Pradabpet, Chusit and Miyanaga, Yoshikazu},
  title = {Fade Dynamics, Availability and Measurement Limits of a Tropical Ku-Band Earth–Space Link: What a Sensor Record Supports},
  journal = {Technologies},
  year = {2026},
  volume = {14},
  number = {11},
  pages = {710},
  doi = {10.3390/technologies14110710}
}
Kostenlos starten →