Automation of the Planning Phase of a Construction Project Using AI Agents
Technologies · 10.06.2026 · 14 (6) · 351
DOI: 10.3390/technologies14060351 ↗Kurz gefasst
Fachartikel in der Zeitschrift Technologies, online erschienen am 10.06.2026. Verfasst von Bartosz Korba und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 31 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The chronic digitalisation deficit within the construction sector induces design anomalies and human errors, leading to a severe erosion of investment profitability. This study aims to implement the automation of resource generation and validation processes, acting as a systemic safety barrier to stabilise analytical workflows. The proposed methodology relies on a Multi-Agent System (MAS) architecture embedded within the n8n environment and powered by Gemini-class language models. The framework integrates a deterministic PostgreSQL database within a Retrieval-Augmented Generation (RAG) architecture, enabling the precise, real-time processing of Construction Law regulations. Applying Chain-of-Thought reasoning alongside structured prompt templates helped eliminate model logic drift, ensuring comprehensive result reproducibility. The deployment of this platform induced a 96% acceleration in the pre-construction phase, reducing the formulation time of Work Breakdown Structure (WBS)/Critical Path Method (CPM) structures from a baseline of 480 min to an average of 20 min. The empirical data demonstrates a radical compression of operational costs (OPEX) concurrent with the marginalisation of the Human Error Probability (HEP) index to a residual level of < 1%. Ultimately, the solution drastically minimised the iterative overhead, confining the design cycle to a single execution while maintaining high level of compliance with the 7R (7 Rights) Logistics Directive.
Zitieren
APA
Korba, B., & Pawluk, K. (2026). Automation of the Planning Phase of a Construction Project Using AI Agents. Technologies, 14(6), 351. https://doi.org/10.3390/technologies14060351
Vancouver
Korba B, Pawluk K. Automation of the Planning Phase of a Construction Project Using AI Agents. Technologies. 2026;14(6):351. doi:10.3390/technologies14060351
BibTeX
@article{Korba2026,
author = {Korba, Bartosz and Pawluk, Katarzyna},
title = {Automation of the Planning Phase of a Construction Project Using AI Agents},
journal = {Technologies},
year = {2026},
volume = {14},
number = {6},
pages = {351},
doi = {10.3390/technologies14060351}
}
EUVIMED