Unpacking Value Creation Mechanisms in User-Pay PPP Infrastructure Projects: An Integrated Grounded Theory, Fuzzy-DEMATEL and ISM-MICMAC Approach
Systems · 27.10.2026 · 14 (11) · 1362
DOI: 10.3390/systems14111362 ↗Kurz gefasst
Fachartikel in der Zeitschrift Systems, online erschienen am 27.10.2026. Verfasst von Zehui Bu und 2 weiteren Autor:innen. Die Arbeit nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Natural Science Foundation of Shandong Province, Social Science Planning Project of Shandong Province.
Abstract (Originalsprache)
User-pay public–private partnership (PPP) infrastructure projects operate as socio-technical systems in which institutional conditions, project viability, contractual governance, and stakeholder behaviour jointly determine whether service value can be converted into sustainable operating revenue. However, existing research often treats these elements as isolated success factors rather than as an interdependent value creation system. This study develops a systemic framework for explaining value creation in user-pay PPP projects by integrating grounded theory, fuzzy Decision-Making Trial and Evaluation Laboratory (Fuzzy-DEMATEL), and Interpretive Structural Modelling–Cross-Impact Matrix Multiplication Applied to Classification (ISM-MICMAC). Grounded theory identifies 23 categories and integrates them into collaborative foundation, collaborative process, and value realization. The subsequent Fuzzy-DEMATEL and ISM-MICMAC analyses focus on 18 factors within the first two dimensions to examine their influence relationships, relative importance, and hierarchical structure. The results show a six-layer mechanism in which socioeconomic and legal environments form foundational drivers, project viability factors occupy intermediate layers, and concession governance and stakeholder collaboration transmit upstream conditions toward value realization. User willingness to pay exhibits the highest centrality, while stakeholder value co-creation willingness constitutes the most proximate behavioural condition. The findings recast user-pay PPP value creation as a layered socio-technical system and identify where interventions should target institutional enabling, project viability, governance design, and collaborative behaviour.
Förderung
- Natural Science Foundation of Shandong Province
- Social Science Planning Project of Shandong Province
Zitieren
APA
Bu, Z., Geng, Z., & Liu, J. (2026). Unpacking Value Creation Mechanisms in User-Pay PPP Infrastructure Projects: An Integrated Grounded Theory, Fuzzy-DEMATEL and ISM-MICMAC Approach. Systems, 14(11), 1362. https://doi.org/10.3390/systems14111362
Vancouver
Bu Z, Geng Z, Liu J. Unpacking Value Creation Mechanisms in User-Pay PPP Infrastructure Projects: An Integrated Grounded Theory, Fuzzy-DEMATEL and ISM-MICMAC Approach. Systems. 2026;14(11):1362. doi:10.3390/systems14111362
BibTeX
@article{Bu2026,
author = {Bu, Zehui and Geng, Zhongyuan and Liu, Jicai},
title = {Unpacking Value Creation Mechanisms in User-Pay PPP Infrastructure Projects: An Integrated Grounded Theory, Fuzzy-DEMATEL and ISM-MICMAC Approach},
journal = {Systems},
year = {2026},
volume = {14},
number = {11},
pages = {1362},
doi = {10.3390/systems14111362}
}
EUVIMED