Intelligent Workforce Scheduling in Manufacturing: An Integrated Optimization Framework Using Genetic Algorithm, Monte Carlo Simulation, and Taguchi Method
Systems · 25.12.2025 · 14 (1) · 26
DOI: 10.3390/systems14010026 ↗Kurz gefasst
Fachartikel in der Zeitschrift Systems, online erschienen am 25.12.2025. Verfasst von Berrin Denizhan und 5 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 73 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: TÜBİTAK.
Abstract (Originalsprache)
Small and medium-sized enterprises (SMEs) constitute a substantial share of industrial production. However, their operational performance is frequently constrained by delivery delays caused by inefficiencies in workforce scheduling and task sequencing. These limitations reduce overall competitiveness, particularly in project-based manufacturing environments where task heterogeneity and multi-skill variability are prominent. To address this challenge, this study develops an artificial intelligence based workforce planning framework tailored to capital-constrained manufacturing settings. The new proposed hybrid system integrates a Genetic Algorithm (GA), Monte Carlo Simulation (MCS), and Taguchi methodology to generate robust, uncertainty-aware labor assignments. The framework is validated through 18-month deployments in two manufacturing facilities with differing levels of technological maturity, demonstrating consistent improvements in operational outcomes. Furthermore, specific weekly examples were validated against the solutions of exact mixed integer linear programming solvers on the deterministic core to assess the optimality gap and ensure constant solution quality. Across the deployments, the system achieved 13% and 15% reduction in task completion times. The resulting GA–MCS–Taguchi pipeline operates efficiently on standard SMEs hardware, requires only short historical performance windows for calibration, and exhibits high user adoption in real industrial settings, which indicates strong operational viability and practical deployability.
Förderung
- TÜBİTAK
Zitieren
APA
Denizhan, B., Yıldırım, E., Fındıklı, B., Erbaş, M. E., Öz, B., & Derya, B. (2025). Intelligent Workforce Scheduling in Manufacturing: An Integrated Optimization Framework Using Genetic Algorithm, Monte Carlo Simulation, and Taguchi Method. Systems, 14(1), 26. https://doi.org/10.3390/systems14010026
Vancouver
Denizhan B, Yıldırım E, Fındıklı B, Erbaş ME, Öz B, Derya B. Intelligent Workforce Scheduling in Manufacturing: An Integrated Optimization Framework Using Genetic Algorithm, Monte Carlo Simulation, and Taguchi Method. Systems. 2025;14(1):26. doi:10.3390/systems14010026
BibTeX
@article{Denizhan2025,
author = {Denizhan, Berrin and Yıldırım, Elif and Fındıklı, Beyza and Erbaş, Mehmet Efe and Öz, Batuhan and Derya, Bengisu},
title = {Intelligent Workforce Scheduling in Manufacturing: An Integrated Optimization Framework Using Genetic Algorithm, Monte Carlo Simulation, and Taguchi Method},
journal = {Systems},
year = {2025},
volume = {14},
number = {1},
pages = {26},
doi = {10.3390/systems14010026}
}
EUVIMED