CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning
Sustainability · 13.11.2026 · 18 (22) · 11593
DOI: 10.3390/su182211593 ↗Kurz gefasst
Fachartikel in der Zeitschrift Sustainability, online erschienen am 13.11.2026. Verfasst von Suphawut Malaikrisanachalee und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Resource-efficient construction planning requires coordination of schedules, material replenishment, limited storage and crew deployment. This study develops CoSPACE, a four-layer chromosome and seven-stage engineering decoder that jointly evaluates project duration (PD), material logistics cost (MC) and crew idle exposure (CIE). CIE measures unused capacity within each labour type’s deployment window, avoiding the redundancy between whole-project idle labour and PD under fixed workloads. Thirty seeded search archives are reconstructed for a deterministic ten-activity benchmark, with decoded-plan verification, an earliest-start reference and controlled gene-group interventions. Nine empirical pooled non-dominated points attain the verified 33-day duration bound. MC ranges from 1473.48 to 1662.40 monetary units as CIE decreases from 119 to 67 worker-days. For this benchmark, a selected compromise reduces MC by 21.94% and CIE by 9.41% against the deterministic reference. Controlled replays distinguish inventory, ordering-frequency and mobilization mechanisms; fixing priorities leaves the compromise unchanged, whereas removing delays worsens logistics cost and CIE. A separate matched-budget study evaluates four fixed cases, including two constructed instances and an adapted published project network with hypothetical logistics and non-interchangeable labour. Receipt flexibility improves HV on two cases, and including CIE in selection improves HV on that adapted network after multiplicity correction; no NSGA-II advantage over SPEA2 is established. Storage-floor sensitivity confirms a restricted allocation domain, but no corrected HV difference under the tested budget. These comparisons do not establish field effectiveness. Environmental impacts and uncertain supply require further evidence.
Zitieren
APA
Malaikrisanachalee, S., Wongwai, N., Srisomboon, W., & Suphanat, P. (2026). CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning. Sustainability, 18(22), 11593. https://doi.org/10.3390/su182211593
Vancouver
Malaikrisanachalee S, Wongwai N, Srisomboon W, Suphanat P. CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning. Sustainability. 2026;18(22):11593. doi:10.3390/su182211593
BibTeX
@article{Malaikrisanachalee2026,
author = {Malaikrisanachalee, Suphawut and Wongwai, Narongrit and Srisomboon, Wittaya and Suphanat, Phaisan},
title = {CoSPACE: Coordinated Construction Scheduling, Material Logistics, Shared Storage, and Crew Deployment for Resource-Efficient Site Planning},
journal = {Sustainability},
year = {2026},
volume = {18},
number = {22},
pages = {11593},
doi = {10.3390/su182211593}
}
EUVIMED