Feasibility Limits in Corridor-Wide EV Fast-Charging Station Planning for Sustainable Transport Electrification: An MILP Study of Puerto Rico’s PR-2
Sustainability · 25.10.2026 · 18 (21) · 10833
DOI: 10.3390/su182110833 ↗Kurz gefasst
Fachartikel in der Zeitschrift Sustainability, online erschienen am 25.10.2026. Verfasst von G. Alejandra Feo-Cediel und 4 weiteren Autor:innen. Die Arbeit nennt 48 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Planning fast-charging infrastructure for electric vehicles (EVs) supports sustainable transport electrification. This study identifies when a corridor-wide plan along Puerto Rico Highway 2 (PR-2) becomes infeasible and which modeled constraint limits it first. A mixed-integer linear programming (MILP) model with 229 candidate sites across 27 municipalities, integer 150 kW port decisions, a 3 MW per-site ceiling, corridor coverage, and a shared upstream-capacity screen is solved for a February 2024 baseline and six electrification scenarios under an upper-bound demand assumption. The baseline is feasible with 30 stations, 178 ports, and 26.7 MW, whereas all six future scenarios are infeasible. San Juan and Guaynabo, which hold one-third of the island’s registered EV stock but four candidate sites each, exhaust their candidate-set capacity first, at closed-form thresholds of 1.78% and 3.38% electrification, versus 8.99% in the calibrated-2030 case. This threshold reproduces the MILP shortfall to four decimal places in all six infeasible scenarios. At a screening fraction of 0.20, removing the upstream screen changes neither feasibility nor shortfall. Restoring 2030 feasibility would require at least 21 and 11 represented 3 MW sites, versus four each. Under the modeled assumptions, these findings support examining candidate-site limitations before upstream grid reinforcement in sustainable corridor planning.
Zitieren
APA
Feo-Cediel, G. A., Campo-Ossa, D. D., Luna-Hernández, A. C., Irizarry-Rivera, A., & Andrade-Rengifo, F. (2026). Feasibility Limits in Corridor-Wide EV Fast-Charging Station Planning for Sustainable Transport Electrification: An MILP Study of Puerto Rico’s PR-2. Sustainability, 18(21), 10833. https://doi.org/10.3390/su182110833
Vancouver
Feo-Cediel GA, Campo-Ossa DD, Luna-Hernández AC, Irizarry-Rivera A, Andrade-Rengifo F. Feasibility Limits in Corridor-Wide EV Fast-Charging Station Planning for Sustainable Transport Electrification: An MILP Study of Puerto Rico’s PR-2. Sustainability. 2026;18(21):10833. doi:10.3390/su182110833
BibTeX
@article{FeoCediel2026,
author = {Feo-Cediel, G. Alejandra and Campo-Ossa, Daniel D. and Luna-Hernández, Adriana C. and Irizarry-Rivera, Agustín and Andrade-Rengifo, Fabio},
title = {Feasibility Limits in Corridor-Wide EV Fast-Charging Station Planning for Sustainable Transport Electrification: An MILP Study of Puerto Rico’s PR-2},
journal = {Sustainability},
year = {2026},
volume = {18},
number = {21},
pages = {10833},
doi = {10.3390/su182110833}
}
EUVIMED