EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

BIM-Based Automated Means-of-Egress Compliance Checking Using IFC for Socially Sustainable and Resilient Buildings: A Saudi Arabian Case Study

Bismillah Mohammadi, Khalid Abolkhair, Abdulrahman A. Altassan

Sustainability · 07.08.2026 · 18 (16) · 8023

DOI: 10.3390/su18168023 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 07.08.2026. Verfasst von Bismillah Mohammadi und 2 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 25 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: King Saud University.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Safe means of egress are central to occupant safety, social sustainability, and building resilience, yet evidence on BIM-based code checking in Saudi Arabia remains limited. This study assesses the feasibility of an IFC-based Solibri workflow for means-of-egress provisions of SBC 201-CR-2024 using a three-story Group R-1 hotel. Code clauses were decomposed into computable variables and conditions requiring manual review. The Revit model was exported to IFC, validated for semantic and topological readiness, classified in Solibri, and checked using the code-neutral SOL/179 Escape Route Analysis template. The final archived run contained nine rule instances: eight returned OK, while one produced a moderate-severity flag in a supporting fire-compartment rule rather than an SBC-mapped egress rule. One source-model revision was required before the final run. Results indicate that the occupant-load calculation was fully checkable within the bounded case, whereas required route count, travel distance, route-origin and measurement logic, egress height, exit-passageway width, and clear door width were only partially checkable. Credible execution required consistent classifications, explicit exit designations, complete spatial relationships, and continuous routes. Applicability conditions, sprinkler qualification, capacity requirements, exceptions, and route validity still required professional judgment. The workflow demonstrates bounded feasibility rather than validated detection performance or proof of SBC compliance.

Förderung

  • King Saud University

Zitieren

APA

Mohammadi, B., Abolkhair, K., & Altassan, A. A. (2026). BIM-Based Automated Means-of-Egress Compliance Checking Using IFC for Socially Sustainable and Resilient Buildings: A Saudi Arabian Case Study. Sustainability, 18(16), 8023. https://doi.org/10.3390/su18168023

Vancouver

Mohammadi B, Abolkhair K, Altassan AA. BIM-Based Automated Means-of-Egress Compliance Checking Using IFC for Socially Sustainable and Resilient Buildings: A Saudi Arabian Case Study. Sustainability. 2026;18(16):8023. doi:10.3390/su18168023

BibTeX
@article{Mohammadi2026,
  author = {Mohammadi, Bismillah and Abolkhair, Khalid and Altassan, Abdulrahman A.},
  title = {BIM-Based Automated Means-of-Egress Compliance Checking Using IFC for Socially Sustainable and Resilient Buildings: A Saudi Arabian Case Study},
  journal = {Sustainability},
  year = {2026},
  volume = {18},
  number = {16},
  pages = {8023},
  doi = {10.3390/su18168023}
}
Kostenlos starten →