A Feasible Region-Based Space–Time Network Modeling Approach for Adding Inspection Train to Existing Schedules
Sustainability · 25.06.2026 · 18 (13) · 6505
DOI: 10.3390/su18136505 ↗Kurz gefasst
Fachartikel in der Zeitschrift Sustainability, online erschienen am 25.06.2026. Verfasst von Minhao Xu und 2 weiteren Autor:innen. Die Arbeit nennt 39 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: China Postdoctoral Science Foundation, Natural Science Foundation of Gansu Province, Tianyou Postdoctoral Science Foundation of Lanzhou Jiaotong University.
Abstract (Originalsprache)
Adding inspection trains to existing railway timetables is a complex task that must balance operational efficiency and service reliability, which are essential for the sustainable operation and maintenance of high-speed railway infrastructure. To address this challenge, a feasible region-based space–time network modeling approach is proposed for incorporating Comprehensive Inspection Trains (CITs) into existing railway schedules, aiming to enhance inspection efficiency while minimizing operational disruptions. Firstly, the constraints that need to be considered when scheduling for CIT are comprehensively analysed and modelled, and a mixed-integer nonlinear model with the objective of minimizing the total number of stops is constructed. In order to eliminate the difficulty of solving this model, based on the original space–time network method, more kinds of train event arcs are introduced to accurately portray the train operation process; in particular, the extra time consumed due to the acceleration and deceleration process is also reflected in the network construction process. The feasibility of various event arcs is evaluated with time windows, and the original problem finally transforms into the equivalent shortest path problem on a feasible event arc network. The processing procedure includes key stages, such as station space–time discretization, interval operation event processing, station capacity handling, and network simplification. The experimental results indicate that the approach effectively resolves all station capacity conflicts, compresses inspection durations, and optimizes the number of stops. Remarkably, the number of non-full-speed inspection sections is reduced by 43.16%, demonstrating the model’s efficiency. Additionally, the proposed approach is computationally efficient, improves timetable capacity utilization for infrastructure inspection, and supports the sustainable operation of high-speed railway systems.
Förderung
- China Postdoctoral Science Foundation
- Natural Science Foundation of Gansu Province
- Tianyou Postdoctoral Science Foundation of Lanzhou Jiaotong University
- Innovative Foundation for Universities Teachers of Gansu Province of China
Zitieren
APA
Xu, M., Zhang, H., & Li, J. (2026). A Feasible Region-Based Space–Time Network Modeling Approach for Adding Inspection Train to Existing Schedules. Sustainability, 18(13), 6505. https://doi.org/10.3390/su18136505
Vancouver
Xu M, Zhang H, Li J. A Feasible Region-Based Space–Time Network Modeling Approach for Adding Inspection Train to Existing Schedules. Sustainability. 2026;18(13):6505. doi:10.3390/su18136505
BibTeX
@article{Xu2026,
author = {Xu, Minhao and Zhang, Haiping and Li, Jiaxi},
title = {A Feasible Region-Based Space–Time Network Modeling Approach for Adding Inspection Train to Existing Schedules},
journal = {Sustainability},
year = {2026},
volume = {18},
number = {13},
pages = {6505},
doi = {10.3390/su18136505}
}
EUVIMED