Optimal Preventive Maintenance Timing for Expressway Asphalt Pavements Based on PMS Deterioration Modeling and Life-Cycle Cost Analysis
Sustainability · 21.04.2026 · 18 (8) · 4116
DOI: 10.3390/su18084116 ↗Kurz gefasst
Fachartikel in der Zeitschrift Sustainability, online erschienen am 21.04.2026. Verfasst von Yongdoo Kim und 3 weiteren Autor:innen. Die Arbeit nennt 22 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korea Expressway Corporation.
Abstract (Originalsprache)
The preventive maintenance (PM) of asphalt pavements reduces life-cycle costs and minimizes resource consumption compared with reactive rehabilitation, yet its cost-effectiveness is highly sensitive to application timing. This study develops a data-driven framework for determining optimal PM timing on Korean expressways by integrating network-level pavement management system (PMS) deterioration modeling with life-cycle cost analysis (LCCA). Using 10-year PMS time-series data from approximately 2200 asphalt pavement sections (2012–2021), a nonlinear regression of the Highway Pavement Condition Index (HPCI) yielded an exponential deterioration model with exponent β = 1.87 (R2 = 0.996), confirming accelerating deterioration beyond a critical service age. The HPCI inflection coincides with the Grade-2 boundary (3.5–4.0), where surface distress growth—dominated by linear cracking (91.3% of total SD)—also peaks. A LCCA across 44 scenarios demonstrated that PM applied immediately before this acceleration onset minimizes the 40-year net present value (NPV; discount rate 4.5%). The optimal first PM application time was estimated at 10.8 years (≈56% of the 19.3-year average service life), reducing the 40-year NPV by up to 7 million KRW per section relative to the milling and overlay baseline (up to 16 million KRW in absolute NPV terms for concrete overlay sections). These findings provide a quantitative, reproducible basis for PM timing decisions applicable to the approximately 4000 km of expressway pavement managed by Korea Expressway Corporation.
Förderung
- Korea Expressway Corporation
Zitieren
APA
Kim, Y., Kim, K., Kim, J., & Bae, S. (2026). Optimal Preventive Maintenance Timing for Expressway Asphalt Pavements Based on PMS Deterioration Modeling and Life-Cycle Cost Analysis. Sustainability, 18(8), 4116. https://doi.org/10.3390/su18084116
Vancouver
Kim Y, Kim K, Kim J, Bae S. Optimal Preventive Maintenance Timing for Expressway Asphalt Pavements Based on PMS Deterioration Modeling and Life-Cycle Cost Analysis. Sustainability. 2026;18(8):4116. doi:10.3390/su18084116
BibTeX
@article{Kim2026,
author = {Kim, Yongdoo and Kim, Kyungnam and Kim, Jinhwan and Bae, Sungho},
title = {Optimal Preventive Maintenance Timing for Expressway Asphalt Pavements Based on PMS Deterioration Modeling and Life-Cycle Cost Analysis},
journal = {Sustainability},
year = {2026},
volume = {18},
number = {8},
pages = {4116},
doi = {10.3390/su18084116}
}
EUVIMED