EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A Hybrid Energy-Saving Scheduling Method Integrating Machine Tool Intermittent State Control for Workshops

Hong Cheng, Haixiao Liu, Shuo Zhu, Zhigang Jiang, Hua Zhang

Sustainability · 07.07.2025 · 17 (13) · 6207

DOI: 10.3390/su17136207 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 07.07.2025. Verfasst von Hong Cheng und 4 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 44 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Production scheduling and machine tool intermittent state control separately influence a workshop’s machining and intermittent energy consumption. Effective scheduling decisions and intermittent state control are crucial for optimizing the overall energy consumption in the workshop. However, the scheduling scheme determines the machine tool intermittent durations, which imposes strong constraints on the decision-making process for intermittent state control. This makes it difficult for intermittent state control to be used in providing feedback and optimizing scheduling decisions, significantly limiting the overall energy-saving potential of the workshop. To this end, a workshop energy-saving scheduling method is proposed integrating machine tool intermittent state control. Firstly, the variation characteristics of workshop machining energy consumption, machine tool intermittent durations, and intermittent energy consumption are analyzed, and an energy-saving optimization strategy is designed. Secondly, by incorporating variables such as intermittent durations, intermittent energy consumption, and variable operation start time, a multi-objective integrated optimization model is established. Thirdly, the energy-saving optimization strategy is integrated into chromosome encoding, and multiple crossover and mutation genetic operator strategies, along with a low-level selection strategy, are introduced to improve the NSGA-II algorithm. Finally, the effectiveness of the proposed method is verified through a machining case. Results show that the generated Gantt chart reflects both production scheduling and intermittent state control decision outcomes, resulting in a 1.51% reduction in makespan, and 3.90% reduction in total energy consumption.

Förderung

  • National Natural Science Foundation of China

Zitieren

APA

Cheng, H., Liu, H., Zhu, S., Jiang, Z., & Zhang, H. (2025). A Hybrid Energy-Saving Scheduling Method Integrating Machine Tool Intermittent State Control for Workshops. Sustainability, 17(13), 6207. https://doi.org/10.3390/su17136207

Vancouver

Cheng H, Liu H, Zhu S, Jiang Z, Zhang H. A Hybrid Energy-Saving Scheduling Method Integrating Machine Tool Intermittent State Control for Workshops. Sustainability. 2025;17(13):6207. doi:10.3390/su17136207

BibTeX
@article{Cheng2025,
  author = {Cheng, Hong and Liu, Haixiao and Zhu, Shuo and Jiang, Zhigang and Zhang, Hua},
  title = {A Hybrid Energy-Saving Scheduling Method Integrating Machine Tool Intermittent State Control for Workshops},
  journal = {Sustainability},
  year = {2025},
  volume = {17},
  number = {13},
  pages = {6207},
  doi = {10.3390/su17136207}
}
Kostenlos starten →