Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China

Shanggang Hei, Hong Zhang, Shen Luo, Ruizhe Zhang, Chao Zhou, Meng Cong, Hongyu Ye

Sustainability · 11.01.2024 · 16 (2) · 656

DOI: 10.3390/su16020656 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 11.01.2024. Verfasst von Shanggang Hei und 6 weiteren Autor:innen. Die Arbeit wurde bisher 29-mal zitiert (Crossref) und nennt 43 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The construction industry is adopting a collaborative paradigm by combining Lean construction (LC) principles and BIM capabilities. Existing studies lack sufficient case studies and performance evaluations, especially for the disassembly and reconstruction stage, creating a gap in the practical application of BIM and Lean construction (BIM-LC) in China. To bridge this gap, this study quantitatively assessed the BIM-LC methodology in a relocation project in Dezhou, China. The project employed BIM-LC practices such as the Last-Planner System (LPS), Just-In-Time (JIT), Kanban, Value-Stream Mapping (VSM), and Continuous Improvement to enhance construction efficiency and minimize waste. Two main areas of the relocation process were investigated: (i) the identification of common barriers and on-site solutions to the implementation of BIM-LC; (ii) evaluation of the construction efficiency, construction and demolition waste (CDW), and carbon-emission performance. The results showed that the BIM-LC strategy improved labor efficiency and productivity by 3.4% and 12.9%, shortened the construction period by 11 days, reduced construction costs by 8.07% (i.e., USD 9093.8), and reduced transportation costs by 12.5% (i.e., USD 1875). The CDW generation rate ranged from 1–5%, which is comparable to the rates observed in residential construction across various countries. The total weight was 1903.8 kg (10.4 kg/m2). Moreover, the carbon emission during the relocation process was 15,288.4 kgCO2e, with a carbon intensity of 83.5 kg/m2. This study extends the knowledge systems on the application of the BIM-LC method in relocation projects and supports data-driven decision making. It also plays a crucial role in fostering new markets for recycled components, contributing to the realization of a sustainable built environment.

Förderung

  • National Natural Science Foundation of China

Zitieren

APA

Hei, S., Zhang, H., Luo, S., Zhang, R., Zhou, C., Cong, M., & Ye, H. (2024). Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China. Sustainability, 16(2), 656. https://doi.org/10.3390/su16020656

Vancouver

Hei S, Zhang H, Luo S, Zhang R, Zhou C, Cong M, et al. Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China. Sustainability. 2024;16(2):656. doi:10.3390/su16020656

BibTeX
@article{Hei2024,
  author = {Hei, Shanggang and Zhang, Hong and Luo, Shen and Zhang, Ruizhe and Zhou, Chao and Cong, Meng and Ye, Hongyu},
  title = {Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China},
  journal = {Sustainability},
  year = {2024},
  volume = {16},
  number = {2},
  pages = {656},
  doi = {10.3390/su16020656}
}
Kostenlos starten →