Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction

Xuefeng Zhao, Haodong Chen, Jing Liu, Jiaqi Liu, Meng Zhang, Yibing Tao, Junbo Li, Xuyang Wang

Sustainability · 22.08.2023 · 15 (17) · 12717

DOI: 10.3390/su151712717 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 22.08.2023. Verfasst von Xuefeng Zhao und 7 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 40 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: the Ministry of Education of the People’s Republic of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Building Information Modeling (BIM) is a very effective technology for supporting lean construction. However, the current application of BIM during the construction phase does not incorporate all necessary elements of the construction site in a comprehensive manner. Additionally, the depiction of the construction process lacks the desired level of detail. These limitations impede the application of BIM-based lean construction. In this paper, we propose a full-element and multi-time-scale modeling approach to BIM during the construction phase. Our method first establishes a full-element model by reconstructing the main body of the building based on construction subdivision dimensions, construction technology, and management objectives. We then create a three-dimensional model that includes a process elements model of circulating materials, temporary facilities, construction machinery, and surrounding environmental elements. The integrated model of these elements provides a comprehensive representation of BIM at any static time point. Second, we conduct multi-time-scale simulations based on the full-element model. Our approach divides the entire time, local time, and special time points into three scales to simulate project progress, local structure construction technology, and working conditions. A case study of the Daxing International Airport construction project verifies that our method can achieve lean management of construction resources. Full-element modeling provides a comprehensive BIM representation at any static time point, thereby supporting lean construction by improving construction resource management, reducing costs, and enhancing efficiency.

Förderung

  • the Ministry of Education of the People’s Republic of China

Zitieren

APA

Zhao, X., Chen, H., Liu, J., Liu, J., Zhang, M., Tao, Y., Li, J., & Wang, X. (2023). Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction. Sustainability, 15(17), 12717. https://doi.org/10.3390/su151712717

Vancouver

Zhao X, Chen H, Liu J, Liu J, Zhang M, Tao Y, et al. Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction. Sustainability. 2023;15(17):12717. doi:10.3390/su151712717

BibTeX
@article{Zhao2023,
  author = {Zhao, Xuefeng and Chen, Haodong and Liu, Jing and Liu, Jiaqi and Zhang, Meng and Tao, Yibing and Li, Junbo and Wang, Xuyang},
  title = {Research on Full-Element and Multi-Time-Scale Modeling Method of BIM for Lean Construction},
  journal = {Sustainability},
  year = {2023},
  volume = {15},
  number = {17},
  pages = {12717},
  doi = {10.3390/su151712717}
}
Kostenlos starten →