EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants

Roman Trach, Oleksandr Khomenko, Yuliia Trach, Oleksii Kulikov, Maksym Druzhynin, Nataliia Kishchak, Galyna Ryzhakova, Hanna Petrenko, Dmytro Prykhodko, Olha Obodіanska

Sustainability · 23.03.2023 · 15 (7) · 5653

DOI: 10.3390/su15075653 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 23.03.2023. Verfasst von Roman Trach und 9 weiteren Autor:innen. Die Arbeit wurde bisher 29-mal zitiert (Crossref) und nennt 57 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The purpose of this research is to study the communication network among the participants in a construction project. The proposed approach contains the solving of the following tasks: identification of the key factors that affect the communication quality; calculation of the “communication quality” indicator between each pair of participants using fuzzy logic; and evaluation of the key measures of centrality using the tools of a Social Network Analysis. Solving the set tasks can help break the problem of the low level of efficiency of construction project deliveries. This study was conducted when the design stage was already complete and the construction project had 17 participants. We used the following factors influencing communication quality: timeliness, understanding, bidirectionality, use of IT tools in communication acts and adequacy. The use of fuzzy logic tools can minimise the subjectivity of the qualitative data obtained from the questionnaires. The analysis of five centrality measures showed that “Project manager”, “Chief engineer”, “Construction site manager”, “Construction works manager” and “Architect” had the greatest values in comparison with other network participants. On the one hand, this organisational structure of communication can be considered correct because the main information flows through the project managers, who make the decisions. On the other hand, this indicates a significant dependence of the construction project on these participants and, in the event of certain risk events, may lead to a decrease in the efficiency of its implementation. The methods presented in this article can be used in project management to analyse a real communication network.

Zitieren

APA

Trach, R., Khomenko, O., Trach, Y., Kulikov, O., Druzhynin, M., Kishchak, N., Ryzhakova, G., Petrenko, H., Prykhodko, D., & Obodіanska, O. (2023). Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants. Sustainability, 15(7), 5653. https://doi.org/10.3390/su15075653

Vancouver

Trach R, Khomenko O, Trach Y, Kulikov O, Druzhynin M, Kishchak N, et al. Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants. Sustainability. 2023;15(7):5653. doi:10.3390/su15075653

BibTeX
@article{Trach2023,
  author = {Trach, Roman and Khomenko, Oleksandr and Trach, Yuliia and Kulikov, Oleksii and Druzhynin, Maksym and Kishchak, Nataliia and Ryzhakova, Galyna and Petrenko, Hanna and Prykhodko, Dmytro and Obodіanska, Olha},
  title = {Application of Fuzzy Logic and SNA Tools to Assessment of Communication Quality between Construction Project Participants},
  journal = {Sustainability},
  year = {2023},
  volume = {15},
  number = {7},
  pages = {5653},
  doi = {10.3390/su15075653}
}
Kostenlos starten →