EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Predicting the Early-Age Time-Dependent Behaviors of a Prestressed Concrete Beam by Using Physics-Informed Neural Network

Hyun-Woo Park, Jin-Ho Hwang

Sensors · 24.07.2023 · 23 (14) · 6649

DOI: 10.3390/s23146649 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sensors, online erschienen am 24.07.2023. Verfasst von Hyun-Woo Park und 1 weiteren Autor:innen. Beteiligte Einrichtung: Department of ICT Integrated Safe Ocean Smart Cities, Dong-A University, 37 Nakdong-Daero 550beon-gil, Saha-gu, Busan 49315, Republic of Korea. Die Arbeit wurde bisher 20-mal zitiert (Crossref) und nennt 64 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Ministry of Land, Infrastructure and Transport, National R&D Project for Smart Construction Technology, Korea Agency for Infrastructure Technology Advancement under the Ministry of Land, Infrastructure and Transport.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper proposes a physics-informed neural network (PINN) for predicting the early-age time-dependent behaviors of prestressed concrete beams. The PINN utilizes deep neural networks to learn the time-dependent coupling among the effective prestress force and the several factors that affect the time-dependent behavior of the beam, such as concrete creep and shrinkage, tendon relaxation, and changes in concrete elastic modulus. Unlike traditional numerical algorithms such as the finite difference method, the PINN directly solves the integro-differential equation without the need for discretization, offering an efficient and accurate solution. Considering the trade-off between solution accuracy and the computing cost, optimal hyperparameter combinations are determined for the PINN. The proposed PINN is verified through the comparison to the numerical results from the finite difference method for two representative cross sections of PSC beams.

Schlagwörter

Stichwörter der Autor:innen

concrete creepconcrete shrinkageearly-age time-dependent behaviorsoptimal hyperparameter combinationphysics-informed neural network (PINN)prestress lossprestressed concrete (PSC) beamtendon relaxation

Autor:innen und Institutionen

  • Department of ICT Integrated Safe Ocean Smart Cities, Dong-A University, 37 Nakdong-Daero 550beon-gil, Saha-gu, Busan 49315, Republic of Korea.

Förderung

  • Ministry of Land, Infrastructure and Transport
  • National R&D Project for Smart Construction Technology
  • Korea Agency for Infrastructure Technology Advancement under the Ministry of Land, Infrastructure and Transport
  • Korea Expressway Corporation

Zitieren

APA

Park, H. W., & Hwang, J. H. (2023). Predicting the Early-Age Time-Dependent Behaviors of a Prestressed Concrete Beam by Using Physics-Informed Neural Network. Sensors, 23(14), 6649. https://doi.org/10.3390/s23146649

Vancouver

Park HW, Hwang JH. Predicting the Early-Age Time-Dependent Behaviors of a Prestressed Concrete Beam by Using Physics-Informed Neural Network. Sensors. 2023;23(14):6649. doi:10.3390/s23146649

BibTeX
@article{Park2023,
  author = {Park, Hyun-Woo and Hwang, Jin-Ho},
  title = {Predicting the Early-Age Time-Dependent Behaviors of a Prestressed Concrete Beam by Using Physics-Informed Neural Network},
  journal = {Sensors},
  year = {2023},
  volume = {23},
  number = {14},
  pages = {6649},
  doi = {10.3390/s23146649}
}
Kostenlos starten →