EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Implementing the LCCE5.0 Framework (Lean Construction, Circular Economy, and Construction 5.0) in the Moroccan Construction Sector

Abderrazzak El Hafiane, Abdelali En-nadi, Mohamed Ramadany

Recycling · 19.03.2026 · 11 (3) · 63

DOI: 10.3390/recycling11030063 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Recycling, online erschienen am 19.03.2026. Verfasst von Abderrazzak El Hafiane und 2 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 148 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Integrating Lean Construction (LC), the Circular Economy (CE), and Construction 5.0 (C5.0) remains challenging in emerging delivery contexts. This difficulty increases when procurement routines determine which practices become enforceable across tendering, contracting, and site execution. This study prioritized barriers to LCCE5.0 implementation in Morocco and translated expert judgments into actionable recommendations. A structured literature review informed the barrier inventory and conceptual framing. The study proposed a three-layer, life-cycle LCCE5.0 framework that links governance, operational routines, and digital enablers. It operationalized 40 critical barrier factors across six dimensions and five life-cycle macro-phases. A two-round Delphi study was conducted with 22 Moroccan experts using a 7-point Likert scale. Barriers were ranked using Round 2 (T2) medians with ties resolved using the interquartile range. Top-box agreement (ratings of 6–7) and consensus tiers were reported. The ranking showed strong stability across rounds, with 92.5% of barrier factors remaining stable. Kendall’s W at T2 equaled 0.817 (p < 0.001), indicating high panel consensus. Results indicated that constraints clustered in upstream governance. Three procurement-centered regulatory and contractual barriers topped the ranking (Mdn_T2 = 7). These barriers reflected missing CE procurement guidelines, limited weighting of environmental criteria, and the absence of circularity and digital requirements in tenders. Six additional barriers reinforced this procurement bottleneck. They included limited owner commitment, weak enforcement authority, limited top-management commitment, and regulatory instability. They also included low interorganizational trust, limited risk-sharing contracts, and tool-centered deployment of LCCE5.0 practices. These findings support procurement-focused recommendations to institutionalize auditable circular requirements and data-enabled verification in tendering and contracting routines. The proposed LCCE5.0 mechanism and the resulting recommendations require empirical validation beyond this Delphi-based prioritization.

Zitieren

APA

Hafiane, A. E., En-nadi, A., & Ramadany, M. (2026). Implementing the LCCE5.0 Framework (Lean Construction, Circular Economy, and Construction 5.0) in the Moroccan Construction Sector. Recycling, 11(3), 63. https://doi.org/10.3390/recycling11030063

Vancouver

Hafiane AE, En-nadi A, Ramadany M. Implementing the LCCE5.0 Framework (Lean Construction, Circular Economy, and Construction 5.0) in the Moroccan Construction Sector. Recycling. 2026;11(3):63. doi:10.3390/recycling11030063

BibTeX
@article{Hafiane2026,
  author = {Hafiane, Abderrazzak El and En-nadi, Abdelali and Ramadany, Mohamed},
  title = {Implementing the LCCE5.0 Framework (Lean Construction, Circular Economy, and Construction 5.0) in the Moroccan Construction Sector},
  journal = {Recycling},
  year = {2026},
  volume = {11},
  number = {3},
  pages = {63},
  doi = {10.3390/recycling11030063}
}
Kostenlos starten →