EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Granularity-Aware Capacity Planning of Alkaline and PEM Electrolyzers Under Heterogeneous Operating Stress

Jianguo Zhu, Huimin Hu, Zhiyin Zhang, Lingwen Zeng, Shan Li, Jiatong Li, Yuhui Lu, Yiwei Qiu, Shanshan Xu, Zhicheng Qi

Processes · 01.11.2026 · 14 (21) · 3503

DOI: 10.3390/pr14213503 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Processes, online erschienen am 01.11.2026. Verfasst von Jianguo Zhu und 9 weiteren Autor:innen. Die Arbeit nennt 54 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Key Task 7 of the Central Enterprise Green Hydrogen Production, Storage, Transportation Innovation Consortium and the Science and Technology Project of Power Construction Corporation of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Off-grid renewable power-to-hydrogen (ReP2H) systems require coordinated capacity planning and operation of alkaline (ALK) and proton exchange membrane (PEM) electrolyzers. This study develops a mixed-integer linear programming model that jointly optimizes candidate-unit capacity, production–standby–idle states, and a technology-specific operating-stress proxy. The objectives combine net annualized cost, wind curtailment, and operating stress. For the 60 MW baseline operating day, the model selects 55 MW of ALK and 1 MW of PEM capacity, with 99.36% wind-power utilization and an electrolyzer-side levelized cost of hydrogen of 2.6864 CNY kg−1. This value excludes wind generation, compression, storage, water treatment, and other balance-of-plant costs. Stress-aware scheduling mainly changes unit dispatch, whereas standby reduces ALK switching. The unit-level module-size, capital-cost, and objective-weight comparisons associate the small baseline PEM share with discrete capacity increments and the tested economic preferences. With the baseline capacity fixed, the continuous full-year three-state simulation produces 3.0750 × 106 kg of hydrogen with 99.429% wind-power utilization at an electrolyzer-side cost of 3.3104 CNY kg−1 and reduces ALK startups by 29.25% relative to the two-state model. These results delimit the operating and scenario conditions under which the reported hybrid configuration applies.

Förderung

  • Key Task 7 of the Central Enterprise Green Hydrogen Production, Storage
  • Transportation Innovation Consortium and the Science and Technology Project of Power Construction Corporation of China

Zitieren

APA

Zhu, J., Hu, H., Zhang, Z., Zeng, L., Li, S., Li, J., Lu, Y., Qiu, Y., Xu, S., & Qi, Z. (2026). Granularity-Aware Capacity Planning of Alkaline and PEM Electrolyzers Under Heterogeneous Operating Stress. Processes, 14(21), 3503. https://doi.org/10.3390/pr14213503

Vancouver

Zhu J, Hu H, Zhang Z, Zeng L, Li S, Li J, et al. Granularity-Aware Capacity Planning of Alkaline and PEM Electrolyzers Under Heterogeneous Operating Stress. Processes. 2026;14(21):3503. doi:10.3390/pr14213503

BibTeX
@article{Zhu2026,
  author = {Zhu, Jianguo and Hu, Huimin and Zhang, Zhiyin and Zeng, Lingwen and Li, Shan and Li, Jiatong and Lu, Yuhui and Qiu, Yiwei and Xu, Shanshan and Qi, Zhicheng},
  title = {Granularity-Aware Capacity Planning of Alkaline and PEM Electrolyzers Under Heterogeneous Operating Stress},
  journal = {Processes},
  year = {2026},
  volume = {14},
  number = {21},
  pages = {3503},
  doi = {10.3390/pr14213503}
}
Kostenlos starten →