EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Investigation into the Mechanical Response of Shield Lining Under Simultaneous Construction of Subway Station and Tunnel

Xusu He, Yang Liu, Shilin Zhang, Xuantao Shi, Yanhua Cao, Xiaowei Li, Sulei Zhang

Processes · 08.12.2025 · 13 (12) · 3968

DOI: 10.3390/pr13123968 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Processes, online erschienen am 08.12.2025. Verfasst von Xusu He und 6 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Shandong Provincial Natural Science Foundation, the China Qingdao Metro Research Project, the Outstanding Youth Foundation of Shandong province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To reduce downtime of the Tunnel Boring Machine and improve construction efficiency of subway tunnels, the tunnel–station synchronous construction method was implemented in the Qingdao metro. In this method, the TBM advanced continuously through the station, while the upper station was excavated in stages using the primary support arch covering technique. Focusing on a construction scheme with low-grade temporary segments, this study develops a three-dimensional numerical model to investigate the mechanical response of shield lining during the simultaneous construction of a subway station and tunnel. The Mohr–Coulomb model and the Elastic model were employed to represent the mechanical behavior of the surrounding rock and support structure, respectively. The deformation, bending moment, axial force, and residual bearing capacity coefficients of the shield lining were systematically examined across six distinct construction stages. The results showed that asymmetric gradual unloading of the surrounding rock at the arch part caused the vertical displacement of the shield lining to be predominantly upward, with a maximum heave of 1.51 mm. Horizontal displacement exhibited significant asymmetry. During station arch excavation, asymmetric unloading led to an increase and clockwise shift in the bending moments of the shield lining. The axial forces transitioned from compression to tension at specific locations (40° and 240°), whereas the removal of temporary supports had only a minor influence. The maximum tensile stress of the shield lining increased by 3.35 times in Stage III and reached 0.69 MPa in Stage V, representing a 1.65-fold increase compared to the previous stage. Although the residual bearing capacity coefficient generally satisfied safety requirements throughout the construction process, it decreased to a minimum of 0.88 in Stage V, a 7% reduction relative to Stage IV, necessitating close monitoring. This study not only confirmed the safety of using temporary segments made of lower-grade concrete (C30) in tunnel–station synchronous construction but also provided valuable insights for optimizing construction schemes and controlling key risks, such as structural deformation, in similarly complex urban environments.

Förderung

  • Shandong Provincial Natural Science Foundation
  • the China Qingdao Metro Research Project
  • the Outstanding Youth Foundation of Shandong province

Zitieren

APA

He, X., Liu, Y., Zhang, S., Shi, X., Cao, Y., Li, X., & Zhang, S. (2025). Investigation into the Mechanical Response of Shield Lining Under Simultaneous Construction of Subway Station and Tunnel. Processes, 13(12), 3968. https://doi.org/10.3390/pr13123968

Vancouver

He X, Liu Y, Zhang S, Shi X, Cao Y, Li X, et al. Investigation into the Mechanical Response of Shield Lining Under Simultaneous Construction of Subway Station and Tunnel. Processes. 2025;13(12):3968. doi:10.3390/pr13123968

BibTeX
@article{He2025,
  author = {He, Xusu and Liu, Yang and Zhang, Shilin and Shi, Xuantao and Cao, Yanhua and Li, Xiaowei and Zhang, Sulei},
  title = {Investigation into the Mechanical Response of Shield Lining Under Simultaneous Construction of Subway Station and Tunnel},
  journal = {Processes},
  year = {2025},
  volume = {13},
  number = {12},
  pages = {3968},
  doi = {10.3390/pr13123968}
}
Kostenlos starten →