Study on Multi-Objective Optimization of Construction Project Based on Improved Genetic Algorithm and Particle Swarm Optimization

Weicheng Hu, Yan Zhang, Linya Liu, Pengfei Zhang, Jialiang Qin, Biao Nie

Processes · 19.08.2024 · 12 (8) · 1737

DOI: 10.3390/pr12081737 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Processes, online erschienen am 19.08.2024. Verfasst von Weicheng Hu und 5 weiteren Autor:innen. Die Arbeit wurde bisher 19-mal zitiert (Crossref) und nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Key R & D Program of China, National Natural Science Foundation of China, Jiangxi Provincial Natural Science Foundation.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction projects require concurrent consideration of the three major objectives of construction period, cost, and quality. To address the multi-objective optimization issues of construction projects, mathematical models of construction period, quality, and cost are established, respectively, and multi-objective optimization models are constructed for different construction objectives. A hybrid optimization method combining an improved genetic algorithm (GA) with a time-varying mutation rate and a particle swarm algorithm (PSO) is proposed to optimize construction projects, which overcomes the shortcomings of the original GA and improves the global optimality and stability of results. Various construction projects were considered, and different construction objectives were analyzed individually. Finally, an uncertainty analysis is developed for the proposed GA-PSO algorithm and compared with GA and PSO. The results indicate that the proposed hybrid approach outperforms the PSO and GA algorithms in providing a better and more stable multi-objective optimized construction solution, with performance improvements of 4.3–8.5% and volatility reductions of 37.5–64.4%. This provides a reference for the optimal design of wind farms, buildings, and other construction projects.

Förderung

  • National Key R & D Program of China
  • National Natural Science Foundation of China
  • Jiangxi Provincial Natural Science Foundation
  • State Key Laboratory of Performance Monitoring and Protecting of Rail Transit Infrastructure

Zitieren

APA

Hu, W., Zhang, Y., Liu, L., Zhang, P., Qin, J., & Nie, B. (2024). Study on Multi-Objective Optimization of Construction Project Based on Improved Genetic Algorithm and Particle Swarm Optimization. Processes, 12(8), 1737. https://doi.org/10.3390/pr12081737

Vancouver

Hu W, Zhang Y, Liu L, Zhang P, Qin J, Nie B. Study on Multi-Objective Optimization of Construction Project Based on Improved Genetic Algorithm and Particle Swarm Optimization. Processes. 2024;12(8):1737. doi:10.3390/pr12081737

BibTeX
@article{Hu2024,
  author = {Hu, Weicheng and Zhang, Yan and Liu, Linya and Zhang, Pengfei and Qin, Jialiang and Nie, Biao},
  title = {Study on Multi-Objective Optimization of Construction Project Based on Improved Genetic Algorithm and Particle Swarm Optimization},
  journal = {Processes},
  year = {2024},
  volume = {12},
  number = {8},
  pages = {1737},
  doi = {10.3390/pr12081737}
}
Kostenlos starten →