EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye

Muhammed Ucar, Mohamad Hmedi, Emre Uzunoglu, Elif Oguz

Oceans · 19.11.2026 · 7 (6) · 98

DOI: 10.3390/oceans7060098 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Oceans, online erschienen am 19.11.2026. Verfasst von Muhammed Ucar und 3 weiteren Autor:innen. Die Arbeit nennt 298 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Türkiye has large offshore wind potential and a new tender in preparation, but no operating farm. This review asks how far Turkish research can support the design of a first project. A structured search of four databases, including the national thesis center, was run on 28 October 2026. The review includes 102 studies of Turkish sites, 24 of them graduate theses. The review covers the four Turkish seas and six candidate sites. Most studies stop at screening or techno-economic feasibility; none uses offshore measurements at a candidate site. Published peak wave periods are typically 4–5 s, but return values and wind–wave misalignment are missing for most sites. Coastal peak ground acceleration near the sites is 0.18–0.56 g, and no site has a site-specific hazard analysis. The 2026 candidate areas lie mostly in water shallower than 60 m, so a first project would most likely be fixed-bottom. Floating systems matter for the deeper resource, yet only one floating concept has been sized for a Turkish site. Port and grid studies rarely go beyond distance, and no cost study tests the draft tender terms. The methods are standard; the missing pieces are measured site data and worked designs at the candidate sites.

Zitieren

APA

Ucar, M., Hmedi, M., Uzunoglu, E., & Oguz, E. (2026). From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye. Oceans, 7(6), 98. https://doi.org/10.3390/oceans7060098

Vancouver

Ucar M, Hmedi M, Uzunoglu E, Oguz E. From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye. Oceans. 2026;7(6):98. doi:10.3390/oceans7060098

BibTeX
@article{Ucar2026,
  author = {Ucar, Muhammed and Hmedi, Mohamad and Uzunoglu, Emre and Oguz, Elif},
  title = {From Site Selection to Deployment: Technology, Infrastructure, and Policy Requirements for Offshore Wind in Türkiye},
  journal = {Oceans},
  year = {2026},
  volume = {7},
  number = {6},
  pages = {98},
  doi = {10.3390/oceans7060098}
}
Kostenlos starten →