Research on the Integration of Steel Structure Design and Fabrication Based on MBSE
Metals · 21.07.2026 · 16 (7) · 812
DOI: 10.3390/met16070812 ↗Kurz gefasst
Fachartikel in der Zeitschrift Metals, online erschienen am 21.07.2026. Verfasst von Xiang Guo und 5 weiteren Autor:innen. Die Arbeit nennt 20 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Science and Technology Research and Development Program of China Railway Group Co., Ltd..
Abstract (Originalsprache)
Existing BIM-based workflows for complex spatial steel bridges often support 3D visualization and documentation, but they still lack a formal requirement-to-function traceability mechanism and a reliable automated link from special-shaped surface modeling to fabrication-oriented data. To address this gap, this study develops and validates a Model-Based Systems Engineering (MBSE)-oriented design–fabrication integration workflow for special-shaped steel bridges. The workflow combines requirement decomposition, functional architecture modeling, ENOVIA-based collaborative data management, skeleton-driven parametric modeling, User-Defined Feature (UDF) templates, Engineering Knowledge Language (EKL) batch instantiation, an IFC-based manufacturing information extension, ProNest nesting, and model-driven NC-code generation. The method was implemented for the Q7 North Pedestrian Bridge, a spatially twisted special-shaped steel landscape bridge. In the case study, the proposed workflow reduced typical repetitive component modeling time by 70.8%, shortened drawing generation time by 80.0%, increased nesting material utilization from 84.6% to 91.8%, and controlled the maximum coordinate-transformation deviation of formwork points within 1.42 mm. Field validation showed a mean fabrication deviation of 1.6 mm and a maximum site assembly closure deviation of 4.5 mm. The results indicate that the proposed MBSE-oriented digital thread improves design consistency, reduces manual data re-entry, and strengthens traceability from requirements to manufacturing and assembly. The study provides a reproducible case-study framework for model-driven steel bridge design–fabrication integration and identifies the limitations of UDF-library construction cost, software-specific learning requirements, and single-project validation.
Förderung
- Science and Technology Research and Development Program of China Railway Group Co., Ltd.
Zitieren
APA
Guo, X., Yang, Y., Liu, W., Huang, D., Lin, T., & Feng, H. (2026). Research on the Integration of Steel Structure Design and Fabrication Based on MBSE. Metals, 16(7), 812. https://doi.org/10.3390/met16070812
Vancouver
Guo X, Yang Y, Liu W, Huang D, Lin T, Feng H. Research on the Integration of Steel Structure Design and Fabrication Based on MBSE. Metals. 2026;16(7):812. doi:10.3390/met16070812
BibTeX
@article{Guo2026,
author = {Guo, Xiang and Yang, Yongyi and Liu, Wei and Huang, Dexing and Lin, Tianhao and Feng, Huang},
title = {Research on the Integration of Steel Structure Design and Fabrication Based on MBSE},
journal = {Metals},
year = {2026},
volume = {16},
number = {7},
pages = {812},
doi = {10.3390/met16070812}
}
EUVIMED