Integrating Reliable Value into the Process Modeling of High-Speed Railway Timetabling with Redundancy Allocation
Mathematics · 11.03.2026 · 14 (6) · 954
DOI: 10.3390/math14060954 ↗Kurz gefasst
Fachartikel in der Zeitschrift Mathematics, online erschienen am 11.03.2026. Verfasst von Huizhang Xu und 5 weiteren Autor:innen. Die Arbeit nennt 39 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: the Major Research Project of China Railway, Fund of China Academy of Railway Sciences.
Abstract (Originalsprache)
As the development of High-Speed Railways (HSRs) shifts from scale expansion to quality and efficiency, high-density timetables face increasing challenges regarding operational stability. Traditional capacity metrics often prioritize volume over service quality, neglecting the economic and service implications of delays. To reconcile theoretical capacity with practical reliability, this paper proposes a novel Reliable Value (RV)-oriented framework for HSR timetabling. We construct a Reserve Capacity Incremental Heuristic Optimization Framework that employs a synergetic integrated stochastic optimization strategy. This methodology treats reserve capacity as a systematically varied analytical parameter rather than a static constant, integrating redundancy layout planning with dynamic recovery adjustments under stochastic delay scenarios. The RV metric quantitatively combines efficiency (Expected Running Time) and robustness (Indirect Capacity Loss). A case study on the Beijing–Shanghai high-speed railway corridor demonstrates a non-linear relationship between reserve capacity allocation and system value. The results identify an optimal saturation interval of 5 to 14 min, where the marginal gains in reliability maximize the overall system value without excessively compromising operational efficiency. These findings provide theoretical support for transitioning from static capacity planning to proactive, value-based resilience engineering through optimized redundancy allocation.
Förderung
- the Major Research Project of China Railway
- Fund of China Academy of Railway Sciences
Zitieren
APA
Xu, H., Xiao, W., Fan, J., Chen, A., Qi, X., & Gao, T. (2026). Integrating Reliable Value into the Process Modeling of High-Speed Railway Timetabling with Redundancy Allocation. Mathematics, 14(6), 954. https://doi.org/10.3390/math14060954
Vancouver
Xu H, Xiao W, Fan J, Chen A, Qi X, Gao T. Integrating Reliable Value into the Process Modeling of High-Speed Railway Timetabling with Redundancy Allocation. Mathematics. 2026;14(6):954. doi:10.3390/math14060954
BibTeX
@article{Xu2026,
author = {Xu, Huizhang and Xiao, Wei and Fan, Jiaming and Chen, Angyang and Qi, Xin and Gao, Tianze},
title = {Integrating Reliable Value into the Process Modeling of High-Speed Railway Timetabling with Redundancy Allocation},
journal = {Mathematics},
year = {2026},
volume = {14},
number = {6},
pages = {954},
doi = {10.3390/math14060954}
}
EUVIMED