Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments

Wen Yi, Ying Terk Lim, Huiwen Wang, Lu Zhen, Xin Zhou

Mathematics · 27.09.2024 · 12 (19) · 3018

DOI: 10.3390/math12193018 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Mathematics, online erschienen am 27.09.2024. Verfasst von Wen Yi und 4 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 48 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, Research Grants Council of the Hong Kong Special Administrative Region, China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Annually, over 10 billion tons of construction and demolition waste is transported globally from sites to reception facilities. Optimal and effective planning of waste transportation holds the potential to mitigate cost and carbon emissions, and alleviate road congestion. A major challenge for developing an effective transportation plan is the uncertainty of the precise volume of waste at each site during the planning stage. However, the existing studies have assumed known demand in planning models but the assumption does not reflect real-world volatility. Taking advantage of the problem structure, this study adopts the stochastic programming methodology to approach the construction waste planning problem. An integer programming model is developed that adeptly addresses the uncertainty of the amount of waste in an elegant manner. The proposed stochastic programming model can efficiently handle practical scale problems. Our numerical experiments amass a comprehensive dataset comprising nearly 4300 records of the actual amount of construction waste generated in Hong Kong. The results demonstrate that incorporating demand uncertainty can reduce the transportation cost by 1% correlating with an increase in profit of 14% compared to those that do not consider the demand uncertainty.

Förderung

  • National Natural Science Foundation of China
  • Research Grants Council of the Hong Kong Special Administrative Region, China

Zitieren

APA

Yi, W., Lim, Y. T., Wang, H., Zhen, L., & Zhou, X. (2024). Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments. Mathematics, 12(19), 3018. https://doi.org/10.3390/math12193018

Vancouver

Yi W, Lim YT, Wang H, Zhen L, Zhou X. Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments. Mathematics. 2024;12(19):3018. doi:10.3390/math12193018

BibTeX
@article{Yi2024,
  author = {Yi, Wen and Lim, Ying Terk and Wang, Huiwen and Zhen, Lu and Zhou, Xin},
  title = {Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments},
  journal = {Mathematics},
  year = {2024},
  volume = {12},
  number = {19},
  pages = {3018},
  doi = {10.3390/math12193018}
}
Kostenlos starten →