Effect of Freeze–Thaw Cycle Times on Basic Properties and Bond Performance with Steel Reinforcement of Tunnel Lining Concrete in the Tibetan Plateau

Yamei Zang, Yulin Zhan, Dongchen Guo, Shixin Liang, Qi Zhao, Qinghua Tao, Hongfa Yu

Materials · 09.05.2026 · 19 (10) · 1952

DOI: 10.3390/ma19101952 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Materials, online erschienen am 09.05.2026. Verfasst von Yamei Zang und 6 weiteren Autor:innen. Beteiligte Einrichtung: College of Engineering, Tibet University, Lhasa 850000, China. Die Arbeit nennt 37 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China Joint Fund, National Natural Science Foundation of China, Tibet Autonomous Region Natural Science Foundation Project.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To investigate the bond performance between reinforcement and tunnel lining concrete under freeze–thaw cycles in plateau regions, pull-out tests were conducted on secondary-lining-reinforced concrete specimens subjected to different numbers of freeze–thaw cycles. The variations in the fundamental properties of the lining concrete, as well as the bond stress and maximum slip between the reinforcement and the concrete, were examined. The results indicate that, with an increasing number of freeze–thaw cycles, the mass of the lining concrete first increases and then decreases, while the compressive strength and splitting strength gradually decrease. The bond stress between the reinforcement and concrete shows a decreasing trend, whereas the maximum slip exhibits an increasing trend. Furthermore, a finite element model of the reinforced concrete pull-out specimen was established using ABAQUS software to simulate the bond performance under different freeze–thaw cycles. The comparison between experimental and simulated results validates the rationality of the finite element model. This study provides a reference for understanding the bond–slip behavior of tunnel lining reinforced concrete subjected to freeze–thaw environments in cold plateau regions.

Schlagwörter

Stichwörter der Autor:innen

bonding stressbond–slip curvefreeze–thaw cyclesmaximum slip valuereinforced concrete

Autor:innen und Institutionen

  • College of Engineering, Tibet University, Lhasa 850000, China.
  • School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China.
  • Civil Aviation Engineering Quality Supervision Station, Beijing 100102, China.
  • College of Civil Aviation, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China.

Förderung

  • National Natural Science Foundation of China Joint Fund
  • National Natural Science Foundation of China
  • Tibet Autonomous Region Natural Science Foundation Project
  • Tibet University Research Grant for On-the-job Doctoral Degree and Postdoctoral Fellows
  • Lhasa Gongga Airport New Second Runway Project Construction Command Funding Project

Zitieren

APA

Zang, Y., Zhan, Y., Guo, D., Liang, S., Zhao, Q., Tao, Q., & Yu, H. (2026). Effect of Freeze–Thaw Cycle Times on Basic Properties and Bond Performance with Steel Reinforcement of Tunnel Lining Concrete in the Tibetan Plateau. Materials, 19(10), 1952. https://doi.org/10.3390/ma19101952

Vancouver

Zang Y, Zhan Y, Guo D, Liang S, Zhao Q, Tao Q, et al. Effect of Freeze–Thaw Cycle Times on Basic Properties and Bond Performance with Steel Reinforcement of Tunnel Lining Concrete in the Tibetan Plateau. Materials. 2026;19(10):1952. doi:10.3390/ma19101952

BibTeX
@article{Zang2026,
  author = {Zang, Yamei and Zhan, Yulin and Guo, Dongchen and Liang, Shixin and Zhao, Qi and Tao, Qinghua and Yu, Hongfa},
  title = {Effect of Freeze–Thaw Cycle Times on Basic Properties and Bond Performance with Steel Reinforcement of Tunnel Lining Concrete in the Tibetan Plateau},
  journal = {Materials},
  year = {2026},
  volume = {19},
  number = {10},
  pages = {1952},
  doi = {10.3390/ma19101952}
}
Kostenlos starten →