Development of a Risk Assessment Method Under the Multi-Hazard of Earthquake and Tsunami for a Nuclear Power Plant
Journal of Nuclear Engineering · 17.01.2026 · 7 (1) · 7
DOI: 10.3390/jne7010007 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Nuclear Engineering, online erschienen am 17.01.2026. Verfasst von Hiroyuki Yamada und 5 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 21 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry of Japan.
Abstract (Originalsprache)
Based on lessons learned from the Fukushima Daiichi Nuclear Power Plant accident caused by the 2011 off the Pacific coast Tohoku Earthquake, and the subsequent tsunamis, Japanese utilities have been upgrading their tsunami countermeasures. To understand the residual risk from beyond-design-basis events, it is important to assess seismic and tsunami risks independently while also recognizing how a plant’s risk profile changes when these events occur concurrently. This study developed a framework for a multi-hazard probabilistic risk assessment (PRA) to evaluate risks to nuclear power plants (NPPs) resulting from the superposition of earthquake and tsunami events. The framework is proposed on the assumption that the targeted plant has previously conducted single-hazard PRAs for both earthquakes and tsunamis. This study presents an approach to define the scope of risk assessment for the superposition of earthquake and tsunami events, based on the results from single-hazard PRAs for each hazard. It provides an analytical framework for superposition scenario analysis and a simplified method for multi-hazard assessment using data from single-hazard assessments. Moreover, a series of steps for the multi-hazard fragility assessment of superposed earthquake and tsunami events are proposed, clarifying the relationship between superposed impacts and the damaged parts and damage modes, accompanied by illustrative examples.
Förderung
- Agency for Natural Resources and Energy, Ministry of Economy, Trade and Industry of Japan
Zitieren
APA
Yamada, H., Nakajima, M., Miura, H., Haraguchi, R., Mihara, Y., & Higo, E. (2026). Development of a Risk Assessment Method Under the Multi-Hazard of Earthquake and Tsunami for a Nuclear Power Plant. Journal of Nuclear Engineering, 7(1), 7. https://doi.org/10.3390/jne7010007
Vancouver
Yamada H, Nakajima M, Miura H, Haraguchi R, Mihara Y, Higo E. Development of a Risk Assessment Method Under the Multi-Hazard of Earthquake and Tsunami for a Nuclear Power Plant. Journal of Nuclear Engineering. 2026;7(1):7. doi:10.3390/jne7010007
BibTeX
@article{Yamada2026,
author = {Yamada, Hiroyuki and Nakajima, Masato and Miura, Hiromichi and Haraguchi, Ryusuke and Mihara, Yoshinori and Higo, Eishiro},
title = {Development of a Risk Assessment Method Under the Multi-Hazard of Earthquake and Tsunami for a Nuclear Power Plant},
journal = {Journal of Nuclear Engineering},
year = {2026},
volume = {7},
number = {1},
pages = {7},
doi = {10.3390/jne7010007}
}
EUVIMED