Optimization of Collaborative Vessel Scheduling for Offshore Wind Farm Installation Under Weather Uncertainty

Shengguan Qu, Changmao Yu, Yang Zhou, Yi Hou, Jianhua Wang, Fenglei Li

Journal of Marine Science and Engineering · 21.01.2026 · 14 (2) · 223

DOI: 10.3390/jmse14020223 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Marine Science and Engineering, online erschienen am 21.01.2026. Verfasst von Shengguan Qu und 5 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 47 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: 2024 Special Project on Marine Economic Development of Guangdong Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The construction cost of offshore wind farms (OWFs) is heavily influenced by vessel scheduling and meteorological uncertainties. To address these challenges, this paper proposes a constraint-driven hierarchical optimization framework for the coordinated scheduling of installation vessels (IVs) and transport vessels (TVs). First, a Mixed-Integer Linear Programming (MILP) model is established to describe the operational constraints, which is then decomposed into two interrelated sub-problems: vessel path planning and scheduling optimization. For path planning, the problem is modeled as a Multiple Traveling Salesman Problem (MTSP) to ensure balanced fleet workloads. This stage is solved via a tailored three-stage heuristic combining balanced sweep clustering and penalized local search. For scheduling optimization, a hybrid Earliest Deadline First (EDF)-Simulated Annealing (SA) strategy is employed, where EDF generates a strictly feasible baseline to warm-start the SA optimization. Furthermore, a stochastic optimization approach integrates historical meteorological data to ensure schedule robustness against weather uncertainty. The validity of the framework is supported by two real-world OWF cases, which demonstrate total cost reductions of 15.44% and 13.20%, respectively, under stochastic weather conditions. These results demonstrate its effectiveness in solving high-constraint offshore engineering problems.

Förderung

  • 2024 Special Project on Marine Economic Development of Guangdong Province

Zitieren

APA

Qu, S., Yu, C., Zhou, Y., Hou, Y., Wang, J., & Li, F. (2026). Optimization of Collaborative Vessel Scheduling for Offshore Wind Farm Installation Under Weather Uncertainty. Journal of Marine Science and Engineering, 14(2), 223. https://doi.org/10.3390/jmse14020223

Vancouver

Qu S, Yu C, Zhou Y, Hou Y, Wang J, Li F. Optimization of Collaborative Vessel Scheduling for Offshore Wind Farm Installation Under Weather Uncertainty. Journal of Marine Science and Engineering. 2026;14(2):223. doi:10.3390/jmse14020223

BibTeX
@article{Qu2026,
  author = {Qu, Shengguan and Yu, Changmao and Zhou, Yang and Hou, Yi and Wang, Jianhua and Li, Fenglei},
  title = {Optimization of Collaborative Vessel Scheduling for Offshore Wind Farm Installation Under Weather Uncertainty},
  journal = {Journal of Marine Science and Engineering},
  year = {2026},
  volume = {14},
  number = {2},
  pages = {223},
  doi = {10.3390/jmse14020223}
}
Kostenlos starten →