EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A New Prediction Model of Cutterhead Torque in Soil Strata Based on Ultra-Large Section EPB Pipe Jacking Machine

Jianwei Lu, Bo Sun, Qiuming Gong, Tiantian Song, Wei Li, Wenpeng Zhou, Yang Li

Infrastructures · 21.11.2024 · 9 (12) · 212

DOI: 10.3390/infrastructures9120212 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Infrastructures, online erschienen am 21.11.2024. Verfasst von Jianwei Lu und 6 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Key Technologies R&D Program of Guangdong Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Cutterhead torque is a key operational parameter for earth pressure balance (EPB) TBM tunneling in soil strata. The effective management of cutterhead torque can significantly maintain face stability and ensure the tunneling machine operates steadily. The Shenzhen Metro Line 12 project at Shasan Station utilized the world’s largest rectangular pipe jacking machine for constructing the subway station. This project has enabled the collection of relevant data to analyze the factors influencing cutterhead torque and to establish a predictive model. The data encompass an abundant array of cutterhead design parameters, operational parameters, properties of the excavated soil, and environmental factors, revealing the distribution characteristics of cutterhead torque during tunneling. The correlation between various factors and cutterhead torque has been examined. By employing multiple regression analysis and a Levenberg–Marquardt (L-M) algorithm-based neural network, an optimal prediction model for EPB cutterhead torque has been developed. This prediction model incorporates various factors, including cutterhead diameter, RPM, soil chamber pressure, soil shear strength, and the soil consistency index. And the degree of influence of each factor on the cutter torque was also revealed. The prediction results demonstrated good accuracy compared to previous models, providing valuable insights and guidance for EPB TBMs or pipe jacking machines operating in soil strata. The current limitations of this model and suggestions for future work have also been addressed.

Förderung

  • Key Technologies R&D Program of Guangdong Province

Zitieren

APA

Lu, J., Sun, B., Gong, Q., Song, T., Li, W., Zhou, W., & Li, Y. (2024). A New Prediction Model of Cutterhead Torque in Soil Strata Based on Ultra-Large Section EPB Pipe Jacking Machine. Infrastructures, 9(12), 212. https://doi.org/10.3390/infrastructures9120212

Vancouver

Lu J, Sun B, Gong Q, Song T, Li W, Zhou W, et al. A New Prediction Model of Cutterhead Torque in Soil Strata Based on Ultra-Large Section EPB Pipe Jacking Machine. Infrastructures. 2024;9(12):212. doi:10.3390/infrastructures9120212

BibTeX
@article{Lu2024,
  author = {Lu, Jianwei and Sun, Bo and Gong, Qiuming and Song, Tiantian and Li, Wei and Zhou, Wenpeng and Li, Yang},
  title = {A New Prediction Model of Cutterhead Torque in Soil Strata Based on Ultra-Large Section EPB Pipe Jacking Machine},
  journal = {Infrastructures},
  year = {2024},
  volume = {9},
  number = {12},
  pages = {212},
  doi = {10.3390/infrastructures9120212}
}
Kostenlos starten →