EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry

Sara Zouriq, Gehan Hamdy, Amr Fawzy, Rejoice Thomas, Hesham El-Askary, Eehab Khalil, Mohamed A. Elsayad, Tarik El-Salawaky

Hydropower · 07.04.2026 · 1 (1) · 3

DOI: 10.3390/hydropower1010003 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Hydropower, online erschienen am 07.04.2026. Verfasst von Sara Zouriq und 7 weiteren Autor:innen. Die Arbeit nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: US Department of Education.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Monitoring dam stability is critical to ensure structural safety and operational reliability. This study integrates Persistent Scatterer Interferometry (PSI) based on Sentinel-1 SAR imagery (2020–2023) with Finite Element Method (FEM) simulations to assess the behavior of the Koyna Dam in India. PSI detected crest displacements between −1.0 and −1.8 mm yr−1, while FEM simulations predicted a maximum vertical displacement of approximately −3.2 mm at the crest. Although these results represent different quantities (time-averaged displacement rates versus peak static displacement), both approaches indicate millimeter-scale deformation and a consistent pattern of settlement at the dam crest, supporting the interpretation of hydrologically driven structural response. The observed differences are primarily attributed to differences in spatial resolution and methodology between point-based FEM outputs and pixel-averaged satellite observations. The study demonstrates that combining satellite-based monitoring with numerical simulations provides a robust and cost-effective framework for dam safety assessment. This integrated approach supports improved interpretation of deformation behavior and offers practical value in extreme conditions, such as during flood events or climate-driven hydrological changes. Furthermore, continued advances in remote sensing and numerical modeling are expected to enhance the reliability of such approaches, making this methodology a transferable and sustainable solution for dam management worldwide.

Förderung

  • US Department of Education

Zitieren

APA

Zouriq, S., Hamdy, G., Fawzy, A., Thomas, R., El-Askary, H., Khalil, E., Elsayad, M. A., & El-Salawaky, T. (2026). Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry. Hydropower, 1(1), 3. https://doi.org/10.3390/hydropower1010003

Vancouver

Zouriq S, Hamdy G, Fawzy A, Thomas R, El-Askary H, Khalil E, et al. Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry. Hydropower. 2026;1(1):3. doi:10.3390/hydropower1010003

BibTeX
@article{Zouriq2026,
  author = {Zouriq, Sara and Hamdy, Gehan and Fawzy, Amr and Thomas, Rejoice and El-Askary, Hesham and Khalil, Eehab and Elsayad, Mohamed A. and El-Salawaky, Tarik},
  title = {Monitoring Koyna Dam Displacements Using Persistent Scatterer Interferometry},
  journal = {Hydropower},
  year = {2026},
  volume = {1},
  number = {1},
  pages = {3},
  doi = {10.3390/hydropower1010003}
}
Kostenlos starten →