EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Risk-Based Supervision of Work Zone Traffic Management: Longitudinal Evidence on Compliance and Safety in Urban Infrastructure Projects

Julián Sánchez Corredor, Marta Luz Arango Uribe, Cristian David Correa Álvarez

Future Transportation · 19.04.2026 · 6 (2) · 90

DOI: 10.3390/futuretransp6020090 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Future Transportation, online erschienen am 19.04.2026. Verfasst von Julián Sánchez Corredor und 2 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 41 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Urban infrastructure works conducted under live traffic conditions often face a persistent gap between approved traffic management plans and their actual field implementation. This gap remains underexplored in longitudinal studies, particularly in utility projects from low- and middle-income urban contexts. This study evaluates a risk-based supervisory approach that integrates daily monitoring of the Traffic Management Plan (TMP) with a corporate risk management framework aligned with ISO 31000. The dataset includes 288 supervised workdays over 16 months (November 2023–February 2025), 99 non-conformity tickets, 96 signal-theft events (137 units), and seven traffic incidents. The analysis combines descriptive statistics, hypothesis testing, logistic regression, segmented longitudinal analysis, count models, response-time evaluation, and a composite risk index. TMP non-compliance decreased from 18.8% to 6.9% between the first and second halves of the study period (p=0.0028). The odds of non-compliance were significantly higher during the staff transition period in April–May 2024 (OR = 3.50; 95% CI: 1.24–9.82), while day and night shifts showed comparable rates. Monthly patterns indicate that staff instability and signal theft contributed to non-compliance levels, and ticket resolution remained slow (mean response time: 69.9 days). These findings highlight the importance of supervisory continuity, contractor stability, and timely corrective actions in improving work zone safety.

Zitieren

APA

Corredor, J. S., Uribe, M. L. A., & Álvarez, C. D. C. (2026). Risk-Based Supervision of Work Zone Traffic Management: Longitudinal Evidence on Compliance and Safety in Urban Infrastructure Projects. Future Transportation, 6(2), 90. https://doi.org/10.3390/futuretransp6020090

Vancouver

Corredor JS, Uribe MLA, Álvarez CDC. Risk-Based Supervision of Work Zone Traffic Management: Longitudinal Evidence on Compliance and Safety in Urban Infrastructure Projects. Future Transportation. 2026;6(2):90. doi:10.3390/futuretransp6020090

BibTeX
@article{Corredor2026,
  author = {Corredor, Julián Sánchez and Uribe, Marta Luz Arango and Álvarez, Cristian David Correa},
  title = {Risk-Based Supervision of Work Zone Traffic Management: Longitudinal Evidence on Compliance and Safety in Urban Infrastructure Projects},
  journal = {Future Transportation},
  year = {2026},
  volume = {6},
  number = {2},
  pages = {90},
  doi = {10.3390/futuretransp6020090}
}
Kostenlos starten →