EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas

Ziran Guo, Xiaolong Xiao, Xiaoxing Lu, Wenqiang Xie, Fangfang Zhu

Energies · 19.11.2026 · 19 (22) · 5608

DOI: 10.3390/en19225608 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 19.11.2026. Verfasst von Ziran Guo und 4 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: the Science and Technology Project of State Grid Jiangsu Electric Power Co., Ltd.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Interconnected low-voltage distribution areas share flexible resources for post-fault service restoration. Acquiring current support information and confirming candidate schedules compete for communication resources. This paper proposes query-cost-aware cooperative restoration scheduling to coordinate neighbor queries and the timely activation of feasible restoration instructions. Shared soft-open-point transfers couple local three-phase dispatch, photovoltaic utilization, battery operation, and load service. Cached responses guide pre-query selection using predicted dual improvement per estimated communication cost. Permanent power-balance equalities provide numerically certified curvature bounds, while current endpoint responses determine the updates. Cooperative instructions are activated after fixed-transfer optimization, nonlinear three-phase four-wire power-flow validation, battery-energy validation, and joint confirmation. Across the main paired simulations, the capped mean time to reach 90% of the reference restoration increment decreases from 20.93 to 17.05 s relative to the Full neighborhood value baseline. In branch-isolation scenarios, 240 of 240 traces attain the target within 60 s, compared with 204 for the baseline. Full query with matched curvature also attains all targets, with a mean time of 17.08 s. These results support the timing improvement of the complete design.

Förderung

  • the Science and Technology Project of State Grid Jiangsu Electric Power Co., Ltd

Zitieren

APA

Guo, Z., Xiao, X., Lu, X., Xie, W., & Zhu, F. (2026). Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas. Energies, 19(22), 5608. https://doi.org/10.3390/en19225608

Vancouver

Guo Z, Xiao X, Lu X, Xie W, Zhu F. Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas. Energies. 2026;19(22):5608. doi:10.3390/en19225608

BibTeX
@article{Guo2026,
  author = {Guo, Ziran and Xiao, Xiaolong and Lu, Xiaoxing and Xie, Wenqiang and Zhu, Fangfang},
  title = {Query-Cost-Aware Cooperative Restoration Scheduling for Interconnected Low-Voltage Distribution Areas},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {22},
  pages = {5608},
  doi = {10.3390/en19225608}
}
Kostenlos starten →