EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Optimized Grid–Source–Station–Charger Coordinated Planning Method for Electric Heavy-Duty Truck

Jing Sun, Jingru Li, Xuyang Wang, Yue Guo, Ruizhang Wang, Luchang Li, Haicheng Liu

Energies · 19.11.2026 · 19 (22) · 5605

DOI: 10.3390/en19225605 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 19.11.2026. Verfasst von Jing Sun und 6 weiteren Autor:innen. Die Arbeit nennt 32 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: State Grid Corporation of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The rapid deployment of electric heavy-duty trucks (EHDTs) imposes coupled siting, sizing, and network reinforcement decisions on charging–swapping infrastructure, yet existing planning studies treat the distribution network, the on-site photovoltaic (PV) source, and the charging/swapping facilities as separate stages, which leads either to passive grid reinforcement or to under-utilized local resources. This paper proposes a grid–source–station–charger coordinated planning model (EH-GSSCC) for EHDT charging–swapping stations that integrates station allocation, on-site PV configuration, battery-swapping deployment, and distribution network expansion within a single mixed-integer linear program. On this basis, a holistic regional methodology is developed, combining a DBSCAN-based weighted clustering for demand estimation, a grid discretization plus multi-factor scoring procedure for candidate-site generation, and the coordinated model for the joint siting and sizing of stations, piles, PV units, swapping batteries, and network reinforcement. The case study with real data shows that the proposed method reduces the total cost by 10.2% relative to the ablated scheme without grid coordination, by 4.3% relative to the ablated scheme without PV, and by 31.4% relative to the charging-only scheme without battery swapping. A four-dimensional evaluation indicates that the proposed scheme attains high scores on cost economy, demand satisfaction, grid friendliness and PV consumption. The results verify the effectiveness of the coordinated grid–source–station–charger framework for regional EHDT infrastructure planning.

Förderung

  • State Grid Corporation of China

Zitieren

APA

Sun, J., Li, J., Wang, X., Guo, Y., Wang, R., Li, L., & Liu, H. (2026). Optimized Grid–Source–Station–Charger Coordinated Planning Method for Electric Heavy-Duty Truck. Energies, 19(22), 5605. https://doi.org/10.3390/en19225605

Vancouver

Sun J, Li J, Wang X, Guo Y, Wang R, Li L, et al. Optimized Grid–Source–Station–Charger Coordinated Planning Method for Electric Heavy-Duty Truck. Energies. 2026;19(22):5605. doi:10.3390/en19225605

BibTeX
@article{Sun2026,
  author = {Sun, Jing and Li, Jingru and Wang, Xuyang and Guo, Yue and Wang, Ruizhang and Li, Luchang and Liu, Haicheng},
  title = {Optimized Grid–Source–Station–Charger Coordinated Planning Method for Electric Heavy-Duty Truck},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {22},
  pages = {5605},
  doi = {10.3390/en19225605}
}
Kostenlos starten →