EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Workload Scheduling and Battery Dispatch in Geographically Distributed Data Centers: A Feasibility and Techno-Economic Assessment

Wenyu Jiang, Anqi Dai, Miankun Li, Chutong Xu

Energies · 13.11.2026 · 19 (22) · 5464

DOI: 10.3390/en19225464 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 13.11.2026. Verfasst von Wenyu Jiang und 3 weiteren Autor:innen. Die Arbeit nennt 26 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Social Science Fund of China.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Workload flexibility and battery storage can support data-center energy management, but evaluating their operating value requires explicit checks of execution feasibility, numerical solution quality, and economic accounting. This study assesses these dimensions in a six-region benchmark with 50,000 tasks and 2407 hourly intervals. Event-time checks reveal resource violations hidden by hourly accounting; regional reassignment restores modeled feasibility but can worsen service and cost outcomes. Same-objective dispatch comparisons and numerical sensitivity analyses improve export revenue and grid-exchange smoothness relative to the historical low-carbon result, without further reducing already-zero purchased-grid emissions. Matched controls and conditional cycle-wear tests show that balanced-policy cash savings can reverse, whereas tested cost-priority adaptations retain positive improvements. Six restricted joint mixed-integer linear programs yield no additional incumbent gain. A seven-point ε-constraint analysis of cost–grid-variation tradeoffs, followed by post hoc checks, identifies one numerically non-dominated candidate and tolerance-dominating alternatives for the other six under the stated tolerances. Auxiliary forecasting remains separate and does not establish a statistically significant advantage of the tested nonlinear predictor. The findings concern deterministic, full-information operating comparisons and do not establish full-scale joint optimality, physical charging provenance, or lifecycle investment profitability.

Förderung

  • National Social Science Fund of China

Zitieren

APA

Jiang, W., Dai, A., Li, M., & Xu, C. (2026). Workload Scheduling and Battery Dispatch in Geographically Distributed Data Centers: A Feasibility and Techno-Economic Assessment. Energies, 19(22), 5464. https://doi.org/10.3390/en19225464

Vancouver

Jiang W, Dai A, Li M, Xu C. Workload Scheduling and Battery Dispatch in Geographically Distributed Data Centers: A Feasibility and Techno-Economic Assessment. Energies. 2026;19(22):5464. doi:10.3390/en19225464

BibTeX
@article{Jiang2026,
  author = {Jiang, Wenyu and Dai, Anqi and Li, Miankun and Xu, Chutong},
  title = {Workload Scheduling and Battery Dispatch in Geographically Distributed Data Centers: A Feasibility and Techno-Economic Assessment},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {22},
  pages = {5464},
  doi = {10.3390/en19225464}
}
Kostenlos starten →