Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 02.07.2026. Verfasst von Xinghua Huang und 6 weiteren Autor:innen. Die Arbeit nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Smart Grid National Science and Technology Major Project.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To address the limitations of traditional day-ahead bidding strategies in handling the time-varying uncertainty of photovoltaic output, and considering that single-point forecasts are insufficient for reliable risk-based decision-making, this paper proposes a day-ahead bidding strategy for PV power plants based on dynamic error-band optimization. First, a dynamic uncertainty quantification method based on dual-model prediction discrepancy is proposed. It couples two complementary forecasting mechanisms—Long Short-Term Memory, and Seasonal Autoregressive Integrated Moving Average—and utilizes the Dynamic Time Warping algorithm to extract their discrepancy as a dynamic input for subsequent risk assessment and decision-making. Secondly, based on this uncertainty indicator, a probabilistic mapping model is constructed to link prediction uncertainty to the risk of power violation, translating the abstract prediction discrepancy into a concrete economic risk probability. Finally, considering the trade-off between economic benefits and security, a dynamic error-band optimization mechanism is introduced to adaptively determine the bidding margin at different time periods. Case results for a 20 MW PV plant show that the dynamic strategy reduces the number of violation events to zero in the tested daily bidding case, compared with four violations under a fixed 5% error band and one violation under a fixed 10% error band. The corresponding economic revenue increases by 5.3% and 11.2% relative to the fixed 5% and fixed 10% strategies, respectively.

Förderung

  • Smart Grid National Science and Technology Major Project

Zitieren

APA

Huang, X., Fan, Y., Wang, L., Zhang, G., Lin, Y., Yin, Z., & Yu, K. (2026). Day-Ahead Bidding Strategy for Photovoltaic Power Plants Based on Dynamic Error-Band Optimization. Energies, 19(13), 3145. https://doi.org/10.3390/en19133145

Vancouver

Huang X, Fan Y, Wang L, Zhang G, Lin Y, Yin Z, et al. Day-Ahead Bidding Strategy for Photovoltaic Power Plants Based on Dynamic Error-Band Optimization. Energies. 2026;19(13):3145. doi:10.3390/en19133145

BibTeX
@article{Huang2026,
  author = {Huang, Xinghua and Fan, Yuanliang and Wang, Lin and Zhang, Gonglin and Lin, Yurun and Yin, Zili and Yu, Kaiwen},
  title = {Day-Ahead Bidding Strategy for Photovoltaic Power Plants Based on Dynamic Error-Band Optimization},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {13},
  pages = {3145},
  doi = {10.3390/en19133145}
}
Kostenlos starten →