Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction
Energies · 27.06.2026 · 19 (13) · 3048
DOI: 10.3390/en19133048 ↗Kurz gefasst
Fachartikel in der Zeitschrift Energies, online erschienen am 27.06.2026. Verfasst von Donghee Jung und 3 weiteren Autor:innen. Die Arbeit nennt 29 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korea government, Ministry of Trade, Industry and Energy.
Abstract (Originalsprache)
Long-horizon multivariate forecasting of nuclear power plant parameters becomes increasingly challenging as the forecast horizon and the number of target variables grow. This study evaluates an long short-term memory (LSTM) autoencoder-based latent trajectory forecasting framework for operator-support-oriented prediction using compact nuclear simulator data. Instead of directly regressing the full future trajectory in the observation space, the proposed framework compresses future trajectories into low-dimensional latent coordinates and predicts those coordinates from short observation histories. Three repeated-seed experiments were conducted to compare direct and latent forecasting across forecast horizons and latent dimensions. Within the direct LSTM baseline considered in this study, direct observation-space forecasting remained competitive at short horizons; whereas, latent trajectory forecasting became increasingly advantageous as the horizon increased. In the 1500-step, 25-channel task, the latent model reduced root mean square error (RMSE) by approximately 16% compared with the direct LSTM baseline while using substantially fewer parameters. Latent-dimension sweeps showed that the smallest bottleneck can have limited representational margin, whereas moderate-to-large dimensions form a broad practical operating range rather than a single universal optimum. These findings suggest that long-horizon nuclear plant parameter prediction can be treated as a conditional trajectory-generation problem in which a short recent plant history is mapped to a compact future-trajectory coordinate, providing a practical, parameter-efficient design direction for AI-assisted plant monitoring and operator support.
Förderung
- Korea government
- Ministry of Trade, Industry and Energy
Zitieren
APA
Jung, D., Bae, J., Kang, H. G., & Lee, S. J. (2026). Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction. Energies, 19(13), 3048. https://doi.org/10.3390/en19133048
Vancouver
Jung D, Bae J, Kang HG, Lee SJ. Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction. Energies. 2026;19(13):3048. doi:10.3390/en19133048
BibTeX
@article{Jung2026,
author = {Jung, Donghee and Bae, Junyong and Kang, Hyun Gook and Lee, Seung Jun},
title = {Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction},
journal = {Energies},
year = {2026},
volume = {19},
number = {13},
pages = {3048},
doi = {10.3390/en19133048}
}
EUVIMED