EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction

Donghee Jung, Junyong Bae, Hyun Gook Kang, Seung Jun Lee

Energies · 27.06.2026 · 19 (13) · 3048

DOI: 10.3390/en19133048 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 27.06.2026. Verfasst von Donghee Jung und 3 weiteren Autor:innen. Die Arbeit nennt 29 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korea government, Ministry of Trade, Industry and Energy.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Long-horizon multivariate forecasting of nuclear power plant parameters becomes increasingly challenging as the forecast horizon and the number of target variables grow. This study evaluates an long short-term memory (LSTM) autoencoder-based latent trajectory forecasting framework for operator-support-oriented prediction using compact nuclear simulator data. Instead of directly regressing the full future trajectory in the observation space, the proposed framework compresses future trajectories into low-dimensional latent coordinates and predicts those coordinates from short observation histories. Three repeated-seed experiments were conducted to compare direct and latent forecasting across forecast horizons and latent dimensions. Within the direct LSTM baseline considered in this study, direct observation-space forecasting remained competitive at short horizons; whereas, latent trajectory forecasting became increasingly advantageous as the horizon increased. In the 1500-step, 25-channel task, the latent model reduced root mean square error (RMSE) by approximately 16% compared with the direct LSTM baseline while using substantially fewer parameters. Latent-dimension sweeps showed that the smallest bottleneck can have limited representational margin, whereas moderate-to-large dimensions form a broad practical operating range rather than a single universal optimum. These findings suggest that long-horizon nuclear plant parameter prediction can be treated as a conditional trajectory-generation problem in which a short recent plant history is mapped to a compact future-trajectory coordinate, providing a practical, parameter-efficient design direction for AI-assisted plant monitoring and operator support.

Förderung

  • Korea government
  • Ministry of Trade, Industry and Energy

Zitieren

APA

Jung, D., Bae, J., Kang, H. G., & Lee, S. J. (2026). Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction. Energies, 19(13), 3048. https://doi.org/10.3390/en19133048

Vancouver

Jung D, Bae J, Kang HG, Lee SJ. Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction. Energies. 2026;19(13):3048. doi:10.3390/en19133048

BibTeX
@article{Jung2026,
  author = {Jung, Donghee and Bae, Junyong and Kang, Hyun Gook and Lee, Seung Jun},
  title = {Latent Trajectory Forecasting for Long-Horizon Multivariate Nuclear Power Plant Parameter Prediction},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {13},
  pages = {3048},
  doi = {10.3390/en19133048}
}
Kostenlos starten →