EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Life-Cycle Cost–Optimal Right-Sizing and Replacement Assessment of Distribution Transformers Under Demand Uncertainty

Jorge Muñoz-Pilco, Milton Ruiz, Cristian Cuji, Edwin García

Energies · 20.04.2026 · 19 (8) · 1983

DOI: 10.3390/en19081983 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 20.04.2026. Verfasst von Jorge Muñoz-Pilco und 3 weiteren Autor:innen. Die Arbeit nennt 43 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Salesian Polytechnic University, GIREI-Smart Grid Research Group.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper presents a scenario-based optimization framework for evaluating the life-cycle cost of right-sizing and replacement timing for distribution transformers under demand–growth uncertainty. The proposed formulation jointly considers the discrete commercial transformer ratings, the discounted investment cost, and the monetized iron and copper losses over a 15-year planning horizon. Demand uncertainty is represented by nine scenarios defined by combinations of initial apparent power demand and annual growth rate, with D1∈{45,50,55} kVA and g∈{3%,4%,5%}. Under these assumptions, the demand envelope evolves from an initial range of 45–55 kVA to approximately 68.1–108.9 kVA in Year 15, while expected demand increases from 50 kVA to about 87 kVA. The optimization results show that the economically optimal policy is to install a 112.5 kVA transformer in Year 1 and maintain that rating throughout the horizon, without triggering any replacement events. The selected transformer maintains expected loading between approximately 0.44 p.u. and 0.77 p.u., while the upper-demand scenario remains below 1.0 p.u. over the entire horizon. These results indicate that, for the demand–growth conditions analyzed, the preferred outcome is a single initial sizing decision rather than a phased replacement strategy. Therefore, the proposed framework provides a consistent scenario-based alternative to deterministic margin-based planning for distribution transformer asset management.

Förderung

  • Salesian Polytechnic University
  • GIREI-Smart Grid Research Group

Zitieren

APA

Muñoz-Pilco, J., Ruiz, M., Cuji, C., & García, E. (2026). Life-Cycle Cost–Optimal Right-Sizing and Replacement Assessment of Distribution Transformers Under Demand Uncertainty. Energies, 19(8), 1983. https://doi.org/10.3390/en19081983

Vancouver

Muñoz-Pilco J, Ruiz M, Cuji C, García E. Life-Cycle Cost–Optimal Right-Sizing and Replacement Assessment of Distribution Transformers Under Demand Uncertainty. Energies. 2026;19(8):1983. doi:10.3390/en19081983

BibTeX
@article{MuozPilco2026,
  author = {Muñoz-Pilco, Jorge and Ruiz, Milton and Cuji, Cristian and García, Edwin},
  title = {Life-Cycle Cost–Optimal Right-Sizing and Replacement Assessment of Distribution Transformers Under Demand Uncertainty},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {8},
  pages = {1983},
  doi = {10.3390/en19081983}
}
Kostenlos starten →