Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines
Energies · 31.03.2026 · 19 (7) · 1708
DOI: 10.3390/en19071708 ↗Kurz gefasst
Fachartikel in der Zeitschrift Energies, online erschienen am 31.03.2026. Verfasst von Jeongkwon Seo und 6 weiteren Autor:innen. Die Arbeit nennt 22 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korea Institute of Energy Technology Evaluation and Planning.
Abstract (Originalsprache)
Floating wind turbines are becoming increasingly mainstream. Floating wind turbines have strengths in terms of cost-efficiency compared to conventional wind turbines. Comparisons between floating and conventional wind turbines can be easily conducted through simulations. In this paper, we estimate the CAPEX and LCOE of fixed and floating offshore wind farms following the INNU cost model with LIR rotor technology and hybrid floater technology.
Förderung
- Korea Institute of Energy Technology Evaluation and Planning
Zitieren
APA
Seo, J., Park, M., Kim, M., Yoon, S., Hernandez, S., Lee, C. H., & Choi, M. (2026). Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines. Energies, 19(7), 1708. https://doi.org/10.3390/en19071708
Vancouver
Seo J, Park M, Kim M, Yoon S, Hernandez S, Lee CH, et al. Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines. Energies. 2026;19(7):1708. doi:10.3390/en19071708
BibTeX
@article{Seo2026,
author = {Seo, Jeongkwon and Park, Miho and Kim, Moonok and Yoon, Sangjoon and Hernandez, Sergio and Lee, Chul Ho and Choi, Moonseok},
title = {Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines},
journal = {Energies},
year = {2026},
volume = {19},
number = {7},
pages = {1708},
doi = {10.3390/en19071708}
}
EUVIMED