EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines

Jeongkwon Seo, Miho Park, Moonok Kim, Sangjoon Yoon, Sergio Hernandez, Chul Ho Lee, Moonseok Choi

Energies · 31.03.2026 · 19 (7) · 1708

DOI: 10.3390/en19071708 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energies, online erschienen am 31.03.2026. Verfasst von Jeongkwon Seo und 6 weiteren Autor:innen. Die Arbeit nennt 22 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Korea Institute of Energy Technology Evaluation and Planning.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Floating wind turbines are becoming increasingly mainstream. Floating wind turbines have strengths in terms of cost-efficiency compared to conventional wind turbines. Comparisons between floating and conventional wind turbines can be easily conducted through simulations. In this paper, we estimate the CAPEX and LCOE of fixed and floating offshore wind farms following the INNU cost model with LIR rotor technology and hybrid floater technology.

Förderung

  • Korea Institute of Energy Technology Evaluation and Planning

Zitieren

APA

Seo, J., Park, M., Kim, M., Yoon, S., Hernandez, S., Lee, C. H., & Choi, M. (2026). Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines. Energies, 19(7), 1708. https://doi.org/10.3390/en19071708

Vancouver

Seo J, Park M, Kim M, Yoon S, Hernandez S, Lee CH, et al. Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines. Energies. 2026;19(7):1708. doi:10.3390/en19071708

BibTeX
@article{Seo2026,
  author = {Seo, Jeongkwon and Park, Miho and Kim, Moonok and Yoon, Sangjoon and Hernandez, Sergio and Lee, Chul Ho and Choi, Moonseok},
  title = {Construction of 25MW Steel–Concrete Hybrid Offshore Wind Turbines},
  journal = {Energies},
  year = {2026},
  volume = {19},
  number = {7},
  pages = {1708},
  doi = {10.3390/en19071708}
}
Kostenlos starten →